Exceptional Meteorological Events That Occurred Starting From 17 October 2024 - Interventions For The Restoration Of The Functionality Of The Public Lighting Plants Of The Municipal Area Of Cesenatico - Intervention Code: 19852
Supply Of Electric Shuttles In The Area Of The Project Of “ Redevelopment Of The Historical Suburbs Of Ragusa: Restoration Accessibility à And Connection With The City à Modern Through The Urban Railway ”
Open Procedure For The Conclusion Of A Framework Agreement For The Assignment Of Ordinary And Extraordinary Maintenance Of The Rome-Lido Railway Of Ostia And Rome-Civita Castellana-Viterbo.
U10 - Supply Of Nr. 2 Railway Motorcarrelli
Gpa Executive Design And Contract For The Construction Of The Napoli-Bari Railway Line, Telese-San Lorenzo-Vitulano-Cup: J41H01000080008-Cig 7989780F05
Integrated Contract For The Executive Design And Execution Of The Works For The "Light Tram Conversion Of The Torre Annunziata - Castellammare Di Stabia - Gragnano" Railway Line "
Egpa N.10498 For The Entrusting The Supply Of "Air Filters, Filter Panels And Filter Cartridges" - Divided Into 3 Lots
Cdc For Roma Capitale - Award Of Engineering And Architecture Services Relating To The Dl And Cse For The "Construction Of The New Tramway Depot In Via Gino Severini - Phase 1" Cup: J81J22002390001 And I81J220022004
Gpa Supply Of Cavp Traverse With Pre -Assembled Attack For Experimentation
Open Procedure For The Conclusion Of A Framework Agreement For The Assignment Of Ordinary And Extraordinary Maintenance Of The Rome-Lido Railway Of Ostia And Rome-Civita Castellana-Viterbo.
Evaluation Interest Supply Of Anti -Pitch Headphones
Pa 15/2025, Divided Into 17 Lots, For The Supply Of Railway Materials Useful For The Maintenance Of The Rolling Stocks Of Rome Viterbo.
U23 - Open Electronic Procedure For The Assignment Of The Supply Of Tram Railways
Pa 15/2025, Divided Into 17 Lots, For The Supply Of Railway Materials Useful For The Maintenance Of The Rolling Stocks Of Rome Viterbo.
Kit Nanopessia
Executive Design And Execution Of The Construction Works Fundamental Railway Track From Naples Vittorio Station To Casoria Station Afragola And The Executive Design And The Construction Of The System Systems And Supply Of Railway Vehicles And Relative Maintenance. Plants D
Oa25_1133_Ripristino With Strengthening Of The Bolzano Cable Car - San Genesio (Pgec -00088)
Oa25_1133_Ripristino With Strengthening Of The Bolzano Cable Car - San Genesio (Pgec -00088)
Oa25_1133_Ripristino With Strengthening Of The Bolzano Cable Car - San Genesio (Pgec -00088)
Oa25_1133_Ripristino With Strengthening Of The Bolzano Cable Car - San Genesio (Pgec -00088)