10 Live Notices for Italy Building Engineering Tenders
Showing 1 to 10
Integrated Contract For The Executive Design And Execution Of The Works For The "Light Tram Conversion Of The Torre Annunziata - Castellammare Di Stabia - Gragnano" Railway Line "
Open Procedure Pursuant To Art. 71 Of Legislative Decree 36/2023, For The Assignment Of A Framework Agreement, Pursuant To Art. 59 Of Legislative Decree 36/2023, Entrusted To A Single Economic Operator, For A Mixed Contract For Works And Services Of Engineering And Architecture, For The Program Of "Building Renovation, Redevelopment And Adjustment Of The Arturo Series Sports Complex" In Naples
- Open Procedure Pursuant To Art. 59 Of Legislative Decree 36/2023 For The Assignment, Through A Framework, Of The Preventive Verification Services Of The Design In Favor Of The Sireg Entities Referred To In The L.R. N. 30/2006
Aria_2025_414.1 - Open Procedure For The Conclusion Of Aq Pursuant To Art. 59 Of Legislative Decree 36/2023 For The Assignment Of The Preventive Verification Services Of The Design In Favor Of The Sireg Entities Referred To In The L.R. N. 30/2006
Aov Su -Sai 008 2025 - Technical Support For The Rup For The Falzes Residential Center Work
Aov Su -Sai 008 2025 - Technical Support For The Rup For The Falzes Residential Center Work
Aov Su -Sai 008 2025 - Technical Support For The Rup For The Falzes Residential Center Work
Pfte Adjustment, Executive Planning Including The Coordination For Safety In The Design Phase, With The Option Of Entrusting The Technical Services Of Legislative Decree, Accounting And Coordination For Safety During Execution In Construction Sites, Relating To The Regeneration Intervention Of The Former Psychiatric Hospital In Sondrio, The Centerpiece Of A New Vision Of Integrated Policies - Only Lot
Dg 08/25 Aq For The Execution Of The Design, Support For The Design And For The Assignment Of Geognostic Investigations And Services For Geotechnical, Geophysical Investigations, Chemical And Biological Analyzes, Structural Surveys And Investigations, Relating To The Levels Of In -Depth Study Of The Planning Of Technical And Executive Feasibility Of Works Of More Than 100,000,000.00.
Call Si017/2025 Municipality Of Visciano - School Building Via Corriole