Supply an oil purifier for the Al-Kahla gas-fired power plant
Transfer of Employees of the Samawah Gas and Combined Power Plant
A Automatic Mobilization System For Liquefied Gas Cylinders
Preparing Fire Equipment For The Project To Design, Equip, Implement And Examine The Firefighting Pipeline Network To The Samawah Refinery
Preparing The General Public With Washer West For The Gas Cylinder Valve
Construction of a building for the gas systems addition department in the Babylon branch building complex
Provision of laboratory equipment at the Latifiya Gas Laboratory, Abu Ghraib)
Purchase spare parts for drilling rig camps
Supply of (control valves in the gas processing system
purchase Project (Emergency Shut-Off Valves for Gas Compressors XV)
Project) Forced Closure Valves For Gas Dresses Xv
Control valves in the gas processing system
Fuel Mixing Device
Announcement For The First Time For The National Tender For The Project) Control Valves In The Gas Treatment System)
Provision of a General Indicator with a Central Indicator for a Gas Cylinder Valve
Supply of Water Blast Machine with Diesel Engine
The second phase of rehabilitation and development of the drilling mud plant (barite and bentonite) / Al-Hadr factory in the form of (participation contract)
Preparing fire equipment for the project to design, equip, implement and examine the firefighting pipeline network to the Samawah refinery
NU15 well basin in Nahr Bin Omar field (maintenance period 365 days from the date of initial acceptance)
Extension Of The Announcement Of The Investment Opportunity Project For The Memayya Investment Refinery