Steel Rebars
NU15 well basin in Nahr Bin Omar field (maintenance period 365 days from the date of initial acceptance)
The rehabilitation work of the industrial water department with the health groups of the workshop and building of the Tanks Maintenance Division Number/2 and the Maintenance Department of the Field Equipment and the Detaine
FLANGE WELDED NECK CLASS.....
Buy Cooling Containers
Consultancy - Schools Toolkit
Take Off And Re -Constructing The Government Of Tariq Bin Ziyad'S Mobilization Station
Purchase Cold Storage Containers
Preparing The Active Ceramic And Alumina Balls
Preparing 500 tons of 9.5 mm aluminum bars in two batches
Preparing mechanical materials for 6 petrol tanks with a capacity of (5000 m3) with mechanical accessories in the Nineveh warehouse for the project to build 6 petrol tanks
construction of four protection points inside the company's headquarters tanks
Boilers tube
Preparing 500 tons of aluminum bars measuring 9.5 mm in the form of two batches
Activated carbon for RO
تجهيز Valves Test And Repair Equipments