Establishing a line of production planting power plants with solar panels with their accessories in form (sharing contract)
Miscellaneous maintenance work at the PS1 warehouse in North Rumaila. Maintenance period (180 days) from the date of initial receipt.
Rehabilitation works for the buildings of the artificial lift sites in Burjesia (Inquiries - Production Department - First Submersible Pumps Division - Second Submersible Pumps Division - Wellhead Maintenance Division Workshop - Caravans Workshop, etc.)
Maintenance of the storage sheds of the Pipes Division in North Rumaila (Chlorine Shed)
Rehabilitation works of the Heavy Machinery Department (the department building and the technical department, the periodic maintenance department and the rest hall, the heavy equipment area, and the health group for the units) in Al-Burjasiya.
Rehabilitation works for the receipt building and health groups for separate buildings in the industrial complex in Al -Burjisiya (maintenance period 365 days from the date of first receipt)
Rehabilitation works for the constituents of the two buildings of the Department of Oil Engineering and the Department of Geological Studies in Al -Burjisiya
The rehabilitation work of the industrial water department with the health groups of the workshop and building of the Tanks Maintenance Division Number/2 and the Maintenance Department of the Field Equipment and the Detaine
Supply of CPC 100, Transport Case, Carry Bag, All Cables and Accessories - CP TD15 Upgrade - FLUKE – 1555 / KIT - Chauvin Arnoux DTR8510 - TRIORES-20B - T&R TEST 5000A Primary Current Injector - CMC 310 With CMControl-3 Protection, P0005872 - TURA – 03B - FLUKE – 345 Power Quality Clamp Meter - FLUKE – 355 AC/DC True RMS Clamp Meter - FLUKE – 179 - FLUKE – 1587 T - FLK – 289/FVF/IR3000 - ARRAS MAXEI MODEL X-LEAN 6000 - BAUR AC/DC HV Tester PGK HB 80/110 KV, 411+017, Transport Case for HV and Operating Unit, 417-179 - DTA 100 C BAUR Oil Breakdown Voltage Tester, 415+043, Transport Case 670-087
Supply of 250,000 litres of distribution and power transformers
construction work of transferring employees at the Bazarkan Gas Power Plant
Fac Epo And Ups For Jucr
Terminal (End Of Project) Evaluation
Supply of for Spare parts for AC MOTORS
Extending The Meltric Power Conneetors
The Vitamatic Viscosity Device
The Provision Of Halfaya Oilfield And Maysan Governorate Green Energy Development And Natural Gas Comprehensive Utilization Study
Preparing and implementing a thunderbolt barrier system
Exchange device
Processing of distribution transformers, capacity and amount of 250,000 liters