Supply And Installation Of Open Surface Electrospinning Machining System
Supply And Installation Of Digital Rheometer Machining System
Supply And Installation Of Two Smart Racks
Corrigendum-I : Supply And Installation Of Centralized Video Surveillance System With Setup Of Command And Control Room
Supply And Installation Of Flat Bed Knitting Whole Garmenting Machining System
Supply And Installation Of Minature Staple Fibre Spinning Line
Supply Installation And Commissioning Of Narrow Weaving Setup Combo For Fancy Elastic And Non Elastic Fabrics
Supply And Installation Of Twin Screw Extruder With 3D Printer
Supply And Installation Of Textile Design Software For Dobby And Jacquard Weaving
Supply, Installation And Commissioning Of Sample Weaving Equipment Combo Set Up For Technical Textile
Supply & Installation Of Outdoor Gym Equipment'S (2 Sets)
Supply And Installation Of Atmospheric Plasma Machine With Web Transport
Supply And Installation Of Capillary Flow Porometer Machining System
Supply And Installation Of Miniature Staple Fibre Spinning Line
Corrigendum-I : Repair, Renovation, And Reconfiguration Of Lab 1 At The Computer Engineering And It Engineering Department, First Floor, Vjti, Matunga, Mumbai.
Repairs And Replacement Of Mangalore Roof Tiles At Structural Engg. Dept For Monsoon Protection.
Repairs And Resetting Sloping Mangalore Tiles Roof Of Textile Engg. Dept. (Monsoon Protection Work)
Emandmrt- Inspection Of Hydrogen Sealing Assembly System (Seal Body And Seal Rings) Inner Oil Catchers Generator And Exciter Bearings No # 5, 6 And 7 And Hydrogen And Exciter Coolers Of 250 Mw Unit 9 Of Ktps-V Stage During Annual Overhaul Period 2025-26.
C.R.Jobs : R/Fces-1,2,3: Dism.,Fab. & Erec. Of Various Damaged Structures I,E; Lintels, Supp. Column, Chutes, O/H, Rev., Zonal Valves, Furnace Roof Top Gas Line Compensators Repair, Delivery Side Buffer And Other Assoc. Jobs.
Rhf Gas Pipe Changing Jobs During The Capital Repair, Urm.