Toggle Offcanvas
...
 
Global India Control Panels Tenders

India Control Panels Tenders

Bid on readily available India Control Panels Tenders with GlobalTenders, the biggest and best online tendering platform, since 2002. Globaltenders.com offers an unmatched database of Control Panels tenders from India, more than any other platform. Daily, new procurement opportunities for Control Panels are uploaded from thousands of sources including all Indian official websites, Indian municipal websites, Indian newspapers and journals.

Bidding for Control Panels tenders in India is extremely lucrative for companies of all sizes. India tendering authorities release contracts for most of the Control Panels products and services procured by them. The most popular categories are -

  • India control panel tenders
  • switch control panels tenders
  • India fuse control panel tenders
Sign up to get instant access to unlimited India Control Panels Tenders with advanced search filters, market analysis, industry trends, tender training and 24/7 customer support. India Control Panels market analysis, India Control Panels industry trends, India Control Panels tender training and 24/7 customer support.

128 Live Notices for India Control Panels Tenders

Showing 1 to 20

Fully Automatic Star Delta Starter Control Panel Suitable For 10Hp Submersible Pumpset.
country India
posting date30 May 2025
deadline03 Jun 2025
Maintenance And Reapirs To Pumps, Motors ,Borewell Pumps, Electrical Control Panels, Starter, Water Level Indicators And Essential Repairs To Water Supply Installations, Comprehensive Maintenance Of Ro Plant
country India
posting date30 May 2025
deadline20 Jun 2025
Maintenance And Reapirs To Pumps, Motors ,Borewell Pumps, Electrical Control Panels, Starter, Water Level Indicators And Essential Repairs To Water Supply Installations, Comprehensive Maintenance Of Ro Plant
country India
posting date30 May 2025
deadline20 Jun 2025
Transportation Of 1No 132 Kv Transformer Control And Relay Panel And 1No 33Kv Tripple Feeder
country India
posting date30 May 2025
deadline10 Jun 2025
Work Of 1) Erection, Commissioning Of Equipments, Control Wiring Etc. Of 220/66Kv 160 Mva Transformer No.-2 Bay For Ehv Class Substation Augmentation And 132Kv Busbar Protection Panel Commissioning At 220Kv Vallabhipur Ss 2)11 Kv Capacitor Bank Shifting & Power Cable Shifting At 66Kv Bunder Road Ss And 66 Kv Sardarnagar Ss 3) Height Raising Of 66Kv Vartej-Navagam H Frame Line And 66Kv Mamsa-Bhadi H Frame Line Under Tr. Division Vartej Of Tr. Circle Amreli, Getco
country India
posting date30 May 2025
deadline20 Jun 2025
Installation Of 3.3 Kv, 300Kvar Capacitor Bank With Control Panels And Shed Foundation And Connected To The 2.5 Mva Secondary Side Switch Of 11Kv/3.3Kv Main Substation Jocp Under Hazaribag Area
country India
posting date30 May 2025
deadline10 Jun 2025
Supllying Installation Testing And Commissioing Of Pump House Plant Automatization And Management System With Microprocessor Based Control Panel Online Monitoring Wireless Conncetivity With Complete Scada Software At Pump Houses At Pump Room No 5 At Old And New Resdl Colony Nh Iv Faridabad
country India
posting date30 May 2025
deadline06 Jun 2025
Repair And Overhauling Service - Serviceability Checks Andrepairs Of Srl Auxiliary Control Panel; Boeing; Yes; Buyerpremises Quantity: 1
country India
posting date30 May 2025
deadline09 Jun 2025
Transportation Of 1No 132 Kv Transformer Control And Relay Panel And 1No 33Kv Tripple Feeder
country India
posting date30 May 2025
deadline10 Jun 2025
Repairing Work To The Existing Old Control Room At Madukkur 110 Kv Ss By Removing Replacing Of Damaged Pressed Tiled Roof And Providing Special Plastering For Walls And Ceiling At Extended Portion Of Panel Room
country India
posting date30 May 2025
deadline09 Jun 2025
Installation Of 3.3 Kv, 300Kvar Capacitor Bank With Control Panels And Shed Foundation And Connected
country India
posting date30 May 2025
deadline10 Jun 2025
Sitc Of 200 Kva Dg Set Along With Control Panel And Allaccessories , Sitc Of 125 Kva Dg Set Along With Controlpanel And All Accessories Quantity: 2
country India
posting date30 May 2025
deadline28 Jun 2025
Training Quadcopter For Training Of Tps On Drone Tech ,Alternator 75Kva , Control Panel With Voltage Meter ,Alternator Pully 8Inch , Mcb Switch Quantity: 9
country India
posting date30 May 2025
deadline19 Jun 2025
Air Whistle Weather Deck Unit Consisting Of Diaphragmsolenoid Valve Air Filter Heater Box. , Palm Push Buttonswitches With Ip 56 Protection For Bulkhead Mounting , Autofog Signal Air Whistle Bulkhead Mounted Control Panel 230V1Ph Ac And 24V Dc Emergency Supply. , Fog Signal Lampwith Lens , Services Of Engineers Tsp Part B Para 7 ,Training , Obs , Documentation , Installation Materials Likebolts Nuts Washers Cable Glands Single Compression Typefrom Branded Reputed Firm Required Pipe Fittings Etcincluding Testing And Tuning Spare If Any. , Monthlywarranty Extension Charges For 12 Months Beyondstandard Warranty As Per Tsp Quantity: 24
country India
posting date30 May 2025
deadline19 Jun 2025
Repair Replacement Of Of Control Valve Lt Panel Earthing Pipeline With Connected Items At Pump House No1 2 3 At Chakabama Mil Stn Under Age (I) Zakhama
country India
posting date30 May 2025
deadline18 Jun 2025
Complete Repairing, Maintenance And Attending Emergency Breakdown Of Electrical Installation Such As Of 04 Nos. Of 33 Kv, 800 Amps Mocbs And All 33 Kv Cts, Pts, All Goab, Busbar Etc. And 11 Nos. Of 6.6 Kv Control Panel Vcbs , 02 Nos. Of 400 Amps Etc
country India
posting date30 May 2025
deadline09 Jun 2025
Repair And Maintenance Of Pump, Motors, Starters, Control Panels, Relays, Capacitor Banks, Filtration Plant And Misc Items At Bhalra Mil
country India
posting date29 May 2025
deadline12 Jun 2025
Wbpwd/Ee/Bkpd/Nieq-08/2025-26 2Nd Call
country India
posting date29 May 2025
deadline16 Jun 2025
Routine, Preventive, Breakdown And Shutdown Maintenance Of 415V Ac Switchgears At Main Plant And Chp Switchgears, 220V Dc, 110V Ac Power Supply System, Esp Control Panels Including Hvr Transformers And Rapping Motors Control, Hydrogen Plant, Local Co
country India
posting date29 May 2025
deadline17 Jun 2025
Replacement Of Damaged/ Worn Out Cables, Mccb, Starters, Single Phasing Preventers, Relays And Other Allied Spears In Pump House I And Ii In Main Control Panel
country India
posting date29 May 2025
deadline04 Jun 2025

Share Share this page