304 Live Notices for India Coal Tenders
Showing 1 to 20
Cleaning Of Spillage Coal And Clearing Of Grizzley During Unloading Of Tippers At Hoppers Of Truck Receiving Station (Trs-1 And 2) Of New Chp And Other Places By Mechanical Means For A Period Of 365 Days At Dipka Expansion Project.
Day-To-Day Works For Shifting Of Pump Motor Sets, Extension/ Shifting Of Pipelines, Laying And Jointing Of Pipelines And Other Associated Works Related To Different Coal Faces At Quarry On As And When Required Basis For A Period Of 365 Days At Dep.
Day-To-Day Shifting, Di, Extension,Laying And Jointing Of Pipeline Ranges On As And When Required Basis For Fire-Fighting Arrangement At Different Coal Stocks And Locations In Mines Premises For A Period Of One Year At Dipka Expansion Project.
Installation Of Waterline Arrangement For Providing Water Supply From Sirki Pond To Coal Stock No. 15, Sriram Camp Etc At Dipka Expansion Project.
Procurement Of Grinding Elements Of 8.5E(10) Coal Mill Under Bm Dept., Ktps.
Deployment Of Manpower For Development Work At Banhardih Coal Block For A Period Of Three Months On St-Urgency Basis.
False Ceiling Work In Rooms And Acoustic Wall Panelling Inside Conference Room Of Coal Bhavan At Ntpc Gadarwara.
Construction Of Boundary Wall Gate Parking Shed And Porta Cabin Foundations At Weighbridge 2 Under Kdcmp
Supply Of Jaw Type Coal Sampler And Coal Sampler Crusher At Coal Handling Plant Wtps.
Supply Of 250A Ldb Panel For Coal Handling Plant At Wtps.
False Ceiling Work In Rooms And Acoustic Wall Panelling Inside Conference Room Of Coal Bhavan At Ntpc Gadarwara.
Rate Contract For Checking And Repairing Of Coal Bunker Of Unit 5 Btps During Upcoming Overhauling.
Epoxy Coal Tar Paint,Epoxy Thinner For Intermediate Quantity: 1200
Hiring Of Third-Party Inspection Agency - Minerals, Ores, Coal & Coke, Non-Metallic Mineral Product Quantity: 1
Providing And Laying Pvc Pipeline Around Coal Depot Of Ningha Oc Patch Under Satgram-Sripur Area.
Replacement Of Coal Transport Pipelines And Related Works In Boiler #6 At Energy Mechanical In Tnpl Unit 1.
Charges for dismantling of existing mill Gear box assembly and assembling of new Overhauled gear box assembly in coal mill C including the charges for labour special type of tools etc
Expression Of Interest (Eoi) Invited For Empanelment Of Experienced Agencies As Jv/ Consortium Partner For Upcoming Coal Handling Plant & Balance Of Plant (Bop) Projects On Design, Engineering, Procurement And Construction (Epc) Basis
Work Of Cleaning Of Coal Bunker & Emptying Manually By Entering Inside The Bunkers / Manual Pocking And Removal Of Coal By Digging The Jammed / Stricken Coal In Boiler Unit Nos. (3 To 5) At Gsecl Ukai Tps. (Bmd-Ii) Wt-4986
H1 B 8520 000003 Soap Liquid,H1 B 6810 000042 Solution Solvent Naptha Coal Tar,F1 5110 000288 Blade Quantity: 15338