Delivery Of Road, Building And Property Drainage Items (60-41-131851500-000)
Expansion Of Bos Radio Coverage In The Inner City Tunnels (090-2025-0017)
2025-155 Swdu Planning And Construction Of The Central Electrical Engineering (Zet) At The Cogeneration Plant Iii - Duisburg-Wanheim Subproject 4 Zet (Overall Project "Hkw Iii 2030")
2025-154 Swdu Construction Services For The Central Electrical Engineering (Zet) At The Cogeneration Plant Iii - Duisburg-Wanheim Subproject 4 Zet Bau (Overall Project "Hkw Iii 2030")
Painter And Varnishing Work (25-86508)
039_Drywall Work House 3 (25-44322)
Interior Plaster - Fire Protection Cladding - Etics (25-86489)
Mkpk Neubau Bw Apotheke Gü
Tile Work
Contract Notice – General Guidelines, Standard Regulations Open Procedure (Construction Work) Turnkey Construction Of A 3-Field Sports Hall With Outdoor Facilities Newly Built 3-Field Sports Hall With Outdoor Facilities In The City Of Bad Vilbel, A New 3-Field Sports Hall Is To Be Built To Replace The Demolished, . More
Contract Notice – General Guidelines, Standard Regulations Open Procedure (Construction Work) District Clinics Of The Darmstadt-Dieburg District - New Cardiac Catheter Laboratory And Cardio Practice - Drywall Walls Ceiling District Clinics Of The Darmstadt-Dieburg District - New Construction Of Cardiac Catheter Laboratory And . More
Public Tender Vob/A Ecological Flood Protection And Floodplain Renaturation On The Oberrieder Bach Renaturation Of The Oberrieder Bach - Mow Area: Approx. 4,850 M² - Milling Area: Approx. 1,950 M² - Clearing Wood, Hours: 60 To 80 Cm: 1 Hour. - Clearing Wood, Hours Up To 20 Cm: Approx. 10 Hours. - Topsoil And. More
Maintenance, Basic And Glass Cleaning In The After-School Care Center And Youth Club, Hecklinger Weg 6, 39418 Staßfurt Ot Neundorf
Maintenance, Basic And Glass Cleaning At The Stadium Of Unity, Hecklinger Straße 81 B, 39418 Staßfurt
Federal City Of Bonn: Ernst-Moritz-Arndt-Gymnasium, Replacement Building - Interior Plastering And Wdvs Work
New Hörstel Town Hall Building; Electrical Installation Work
Werner-Von-Siemens-Gymnasium, Extension - Metal Construction Work
301_2-373 Rbb - Redesign Of The Grandstand At Lake Baldeney In Essen - Here: Locksmith Work
2025-154 Swdu Construction Services For The Central Electrical Engineering (Zet) At The Cogeneration Plant Iii - Duisburg-Wanheim Subproject 4 Zet Bau (Overall Project "Hkw Iii 2030")
2025-155 Swdu Planning And Construction Of The Central Electrical Engineering (Zet) At The Cogeneration Plant Iii - Duisburg-Wanheim Subproject 4 Zet (Overall Project "Hkw Iii 2030")