Similar tenders from other countries.
Showing 1 to 20
Tmm6209Oej0: Works For The Soterrada Prolongation Of Malaga Metro Metro To Civil Hospital. Subtram Iii: Eugenio Gross - Blas De Lezo. Infrastructure And Superstructure Work
Construction No. 40759 Multifunctional Operas. Malovanka, Stage 0001 Building Object; Completing The Construction
Expansion Of Voivodship Road No. 401
New Building S-Bahn Route S21; Ve 06 - Equipment Tunnel Structure And Traffic Station
Tmm6209Oej0. Soterrada Prolongacion L2 Mm To Subtram Iii Civil Hospital
Performance Of Service Activities (Maintenance And Technical Examinations) And Repairs Of The Construction And Technological Part Of The Tunnels Žilina And Ovčiarsko And Technological Equipment Of The D1 Motorway D1 Hričovské Podhradie - Lietavská Lúčka
Glösinger And Freienohler Tunnels, Planning Services
Tmm6209Oej0. Prolongacion Saterrada L2 Mm A Hospital Civil Subtramo Iii
Technical Assistance Services For The Monitoring And Control Of Execution Of The Works Of The Construction Construction Construction Project Of The Villabona Tunnels (90I And 90Ii). León-Gijón Line.
Notice Of Solicitation At Manifestation Of Interest N ° 05/Asmi/Mincommerce/Of June 23, 2025 Relating To The Selection Of Companies Relating To The Building And Public Works For The Construction Of Eighty-Six (96) Tunnels Of Sampling Of Eleven (11) Meters Linear On The Sites Of The Centers Of Excellence Of Post-Harvest Treatment Of Cocoa End Of Obala (Department Of The Lekie) And Mvomeka’A (Dja And Lobo'S Department) In Two (02) Distinct Lots .-
Installation Constitution Fedacla, Sils (Part 1: Measures Relief Stolls)
Open Procedure, Pursuant To Art. 71 Of Legislative Decree No. 36/2023 And Ss.Mm.Ii., For The Assignment Of The Execution Of The Works Concerning The Landslide Of Bema On The Bitto - So -Called Stream. "Bema Gallery"
To 05/25 "S.S. 28" Of The Colle Di Nava "
Mp-230044, Danger Spots In Tunnels F3, Architectural Work
Design And Construction Of The Rough Design And Construction Within The Scope Of The Lisbon Metropolitan Expansion Plan. Extension Of Yellow And Green Lines (Mouse-Cais Do Sodré) From Pk 0+0 To Pk 1+319,729
Spgk_ Change And Renewal Cramberger Tunnel
2. S-Bahn Master Route Munich, Construction Phase Underground East And Ostbahnhof, Tender And Planning (Optional) Of The Main Construction Services Ve766
14Tei10205 2. S-Bahn Master Route Munich-Pu 30 Shell Construction Work Tunnel West With Trough And Hp Hauptbahnhofbahnhofplatz
Hwk_Tunnel Educational Work On The Eifest Track 2631
Overall Project Manager Art Construction Projects And Engineer Kunstbau