Similar tenders from other countries.
Showing 1 to 20
Supply of electrical cables, transformers, cells, junction boxes, hardware and HEA supports
Heating Systems, Refrigerences, Assistant And High-Powered Electricam Equipment, Auxiliary And High-Powered Electricam Equipment In The Building Of The Peoples' Friendship, Auxiliary And High-Powered Electricity Equipment, Ventilation, Rp
Heating Systems, Refrigerences, Assistant And High-Powered Electricam Equipment, Auxiliary And High-Powered Electricam Equipment In The Building Of The Peoples' Friendship, Auxiliary And High-Powered Electricity Equipment, Ventilation, Rp
Rbk -Tfa 3 - Reinforcement Of Driving Power Supply, 5Th Ba Guw Trafo Exchanges
Installation Work Of A Transformer Position In The Interest Of Rehabilitation Of The Conteerstuff In Contern: - Prefabricated Mt Post, Dimensions: 7.1 M X 2.8 M X 3.1 M - Middle Voltage Cell: Bouclage / Sectioning And Mt Counting Measurement - Three -Phase Transformer Dry Type 400Kva - Tgbt + Photovoltaic, 8 Cells - Tables - Tables - Tables - Wiring And Journey - Earth Network And Equipotential, 100M 1X95Mm² - All Accessories Beginning Of The Work: September 2025 Duration Of The Work: 70 Working Days (In Several Phases)
Supply And Delivery Of Transformers – Outdoor 1 Phase 33Kv/Lt – 0.3Kva – 170Nos.
Yearly Repair And Maintenance Of 11 Kv, 11/0.4 Kv And 0.4 Kv Overhead Distribution Line, Refurbishment Of Distribution Transformer, Replacement Of Transformer, Installation Of Transformer Against Overload, Load Balancing And Welding Of Transformer For Nocs Swamibag, Dpdc.
Package 2: Procurement Of Metal Materials To Ensure Ship Repair 206
Package 08 (Building And Supplying Goods): Building A Medium -Voltage Lighting And Relocation System And Transformer Stations Across The Route, Supplying And Installing Equipment.
Package 1: Procurement Of General Materials To Ensure Ship Repair 206
61--Power Supply
Cable Assembly,Spec
Cable And Conduit A
Cole River Substation Purchase And Possible Installation Sources Sought
Acquisition Of Three -Phase Transformer For The Nueva Esperanza National College
Plate Elaboration Service For Distribution Transformers.
Supply And Delivery Of Transformers – Outdoor 1 Phase 33Kv/Lt – 0.3Kva – 170Nos.
Announcement On The Termination Of The Construction Project Of The New Backup Transformer (630Kva) For Power Supply (Three Times) Of Fuyang Municipal Education Bureau
Package 10 "Designing, Providing Technological Equipment And Construction Of Works For The Main Factory; 22/110Kv Transformer Station And 110Kv Line Connection" Line "
supply of mobile AIS type stations, 33/11 kV, with a quantity of (3) stations, with a capacity of 1 x 31.5 MVA