Similar tenders from other countries.
Showing 1 to 20
Promotor Transformers On The Basis Of The Draft Transformers And Reviews Of The Tm Transfer Duties (Indicated With Vat).
Carrying Out A Transformer At The Ammc Fb Of The Ammc Fb Ctp Tm 630 / 10Mvt.
A13 Transformer - Ro .
Execution Of A Construction And Performance Project And Construction And Assembly Works According To This Project For The Task "Gpz Majewo. Comprehensive Modernization Of The Station".
Purchase Of Malmaterial And Spare Parts For Hydromechanical And Electrotechnical Equipment At Pumping Stations
Island Creek Switchyard Transformer
Bzp.271.23.2025 "Sustainable Urban Mobility In The Southern Subregion: 1) Construction Of A Bicycle Route In The Nysa Commune, 2) Construction Of A Walking And Bicycle Route On A Weir At The Hydroelectric Power Plant, 3) Construction Of Medium And Low Voltage Energy Networks Together With A Pole Transformer Station At Nysa St.
Bzp.271.23.2025 "Sustainable Urban Mobility In The Southern Subregion: 1) Construction Of A Bicycle Route In The Nysa Commune, 2) Construction Of A Walking And Bicycle Route On A Weir At The Hydroelectric Power Plant, 3) Construction Of Medium And Low Voltage Energy Networks Together With A Pole Transformer Station At Nysa St.
Installation, Testing And Commissioning Of 66/11 Kv, 22.5 Mva Power Transformer At Suichatar S/S And 66 Kv Sf6 Circuit Breaker And Ct Installation At Banepa S/S
Erection Of High Tension Line(Ht Along With Transformer And Other Necessaries) Of Basaha Chaudandigadhi Brihat Wsp Udayapur
Commissioning And Buying Spare Parts (Vacuum Switch 10Kv 630A, Current Transformer 6/10Kv, Etc.) For The Pumping Stations Jaman-Adyr
Switching The Track Of The 400 Kv Kv Ostrołęka-Wyszków-Stanisławów Working At 220 Kv Voltage With 400 Kv Voltage Together With Replacement Of A 220/110 Kv Transformer At The Wyszków Station Per Unit 400/110 Kv
Column-Transformer Stations Distribution Cabinets
Building Construction Transformer Station
Maintenance Of Electric Plants And Transformers 2025
Bidding Package: Supplying Supplies And Materials Of Transformer Stations
18Tc.Scl2025: Construction Of The Item: Repair Replaces The Cutting Machine 575 - 500Kv Nho Quan Transformer Station
Transformer Central Works Will Be Done
Deliveries Of The Sn/Nn Switching Transformers In 2025 And 2026 For The Needs Of Pge Dystrybucja S.A.
Acquisition And Installation Of Transformers And Electrical Materials