Similar tenders from other countries.
Showing 1 to 20
Lankasuo'S Excavation, Step 1A
14Tei10205 2. S-Bahn Main Line Munich - Ve 30 Shell Construction Work Tunnel West With Trough And Hp Hauptbahnhof Bahnhofplatz
Lankasuo'S Excavation, Step 1A
Construction, Implementation And Maintenance Of The Business Data Mining System (Sedb) At Zus
Carrying out all operations related to the extraction of raw coal from the B2 (E5/E6) workshop of the Central Mine, amounting to approximately 300 thousand tons.
Implementation of all operations related to advancing on semi-mechanized mine routes in Phase Three of Process One, approximately 2000 meters.
Implementation of all operations related to advancing in the Parodeh mines belonging to the Parodeh Coal Company of Tabas, approximately 1000 meters.
Repair And Maintenance Of Mining Equipment With Internal Combatative Engines
Oz/261/365-Ws(Sk)/2025 Delivery Of Concrete Products
Spare Parts For Construction And Mining Machines
Constructions Of Classations G314, G315 And G322
Gkr.271.4.2025.Ez "Construction Of A Transport And Storage Base For The Needs Of The Czarny Bór Commune In The Post-Mining Area At Główna Street In Czarny Bór"
Modernization Of 1 Piece Of Belt Conveyor With A Maximum Length Of 1850 [M] And Tape Width 1000 [Mm] Pioma 1000, Intended For Work In Underground Mining Plants Extracting Hard Coal, In Excavations At Risk Of Methane And Coal Dust Explosion
14Tei10205 2. S-Bahn Main Line Munich - Ve 30 Shell Construction Work Tunnel West With Trough And Hp Hauptbahnhof Bahnhofplatz
[Copy] Works On The Investment Maintenance Of Construction Facilities - Execution Of Works On Adaptation And Modernization Of The Tank Of The Oil Derivatives R-11, R-1
14Tei10205 2. S-Bahn Master Route Munich-Pu 30 Shell Work Tunnel West With Trough And Hp Hauptbahnhof Bahnhofplatz
Oz/261/361-Ws (Sk)/2025 Pp Pp Dn 500 Sn Delivery 10
14Tei10205 2. S-Bahn Master Route Munich-Pu 30 Shell Work Tunnel West With Trough And Hp Hauptbahnhof Bahnhofplatz
14Tei10205 2. S-Bahn Master Route Munich-Pu 30 Shell Work Tunnel West With Trough And Hp Hauptbahnhof Bahnhofplatz
Energetic Renovation Visitor Mine And Museum Kleinenbremen - Freelance Performance