Similar tenders from other countries.
Showing 1 to 20
Tender Cancellation Letter. The Provision Of Boiler Pipe Bending For A Period Of 36 Months At Camden Power Station.
Y1Da--Nrm-Const Proj#632-22-900 Upgrade Boiler Plant
J046--Water Chemistry 36C24825Q0501
J046--Water Chemistry 36C24825Q0501
Amend 002 - Iija Lit Atct, Hvac, Replace Boiler, Controls System
Boiler House Prv Station Rebuilds
Electrical Gear Replacement
Service Reviews Of Boilers And Removal Of Failures - Gas Boilers In A Leased Facility From Jsw S.A. Kwk "Borynia-Zofiówka-Bzie"
"Modernization Of The Krm 4.6" Boiler Grate
Waste Collection And Management
This Consultation Concerns The Project Management For The Work Of A Biomass Boiler Room For Municipal Buildings
Execution Of The Works For A Biomass Network Located In Sant Joan De Vilatorrada, To Feed The Facilities Of The Joncadella School And The Collbaix School. The Work Is Formed By: - A Heat Network That Will Allow The Generation Of Heating And Acs Of The Facilities Exposed And Have A Source Of Generation Of Renewable Thermal Energy For All Of Them. - A Biomass Boiler Installation That Will Have An Automatic Power Supply System To Transport The Fuel From The Silo To The Boiler. The Fuel To Be Used Will Be Forest Splinner, Preferably Proximity To Ensure The Minimization Of The Carbon Footprint Produced In Its Transport. The Boiler Will Have The Elements Of The Most Developed Technologies In The Biomass Boiler Sector, And Will Follow The Strictest Rules On Emissions In Order To Guarantee The Least Impact On The Environment. The Actions Include The `` Executive Project Of A Heat Network With Biomass In Sant Joan De Vilatorrada, Drafted By The Technician Carlos Carrillo Romero, Industrial Technical Engineer Of The Engineering Area Grup Serveis Technicals, S.L., Initially Approved By Agreement Of The Plenum Of The Corporation Dated May 30, 2024, Without Allegations In The Public Exhibition Period.
Works Contained In The Project Of The Works Of “Change Of Diesel And Cooler Boiler, For Heat Pumps, In The Museum Of Contemporary Art Esteban Vicente”
Announcement On The Competitive Consultation Of Boiler Room Renovation Project For The Renovation Of Dormitory (Phase Ii) Of The Secondary Art School Affiliated To Xinjiang Art Institute
Boiler Plant Water Treatment
Reconstruction Of Boiler Room - Asylum House 4531110-0
Regular Maintenance Of Machine Installations
Modernization Of The Boiler Room In The Building Of The Jl Setting At Pkp Jelcz Laskowice In The Field Of Adaptation To The Environmental Protection Act Along With Windows Replacement.
Renovation Of The Masonry Part Of The Jarota Gas Boiler Room.
- Removing The Failure Of The Heating Industry In Epec Sp. Z O. O. - With Udt Permissions For Water Boilers.