4 Live Notices for Spain Wind Tenders
Showing 1 to 4
Resolution Of The Government Delegation In The Valencian Community By Which The Calls For The Lifting Of Minutes Prior To The Occupation Are Annulled In The File Of Forced Expropriation Of The Goods And Rights Affected By The Works Of The "El Cid I" Wind Farm, Of 36.6 Mw Of Installed Power, And Its Evacuation Infrastructures In The Municipal Terms Of Portell De Morella, Cintorres And More. The Province Of Castellón.
Service Consisting Of Carrying Out Verification Related To The Inspections Plan Of The General Directorate Of Energy.
Announcement Of The Industry And Energy Dependency Of The Government Subdelegation In Cuenca, Which Is Submitted To The Public Information Procedure, The Environmental Impact Study, The Application For Prior Administrative Authorization, The Application For Administrative Authorization Of Construction And The Request For A Statement Of Public Utility For The Wind Generation Modules "Elawan Belinchón I Hybrid Elawan Belinchón Iii Hybrid ", With 21.6 Mw Of Installed Power The First Two And 28.8 Mw Of Installed Power The Third, For Its Hybridization With The Existing Photovoltaic Parks And Their Evacuation Infrastructure, In The Province Of Cuenca.
Announcement Of The Industry And Energy Area Of The Government Subdelegation In Tarragona By Which The Application For Prior Administrative Authorization And Environmental Impact Declaration Of The Peol-Fv-234 Project That Includes "Photovoltaic Plant Hybridization Corbera Wind Park" Of 16,792 Mwp Of Peak Power In Modules And 15.51 Mw Of Power Installed In Investors, Infrastructure Of Evacuation And Evacuation Infrastructure, Evacuation Infrastructure, Expansion Of Set Vilalba Corbera 132/30 Kv, Located In The Province Of Tarragona.