172 Live Notices for Spain Solar Tenders
Showing 1 to 20
Works For The Implementation Of Photovoltaic Solar Energy Of Self -Consumption In Etap, Wwtp And Deposits. Agua Agua Project Performance. Recovery, Transformation And Resilience - Financed By The European Union - Next Generation Eu
Works Included In The Memory Valued For The Installation Of A System Of Electrical Generation Through Photovoltaic Solar Energy In The Municipal Sports Pavilion Of Vila-Seca.
Bid Of The Mixed Work And Supply Contract "Photovoltical Installation Project With Storage For Local Self -Consumption. Cañada Vellida".
Supplies For The Work Of Perimeter Enclosure And Access Ramp In Municipal Solar
Hiring Of Lighting Works By Means Of Bidegorri Solar Lamps Between Legorreta And Itssondo.
Announcement Of The Department Of Territory, Housing And Ecological Transition Of The Generalitat Of Catalonia Which Proceeds To The Call For The Drafting Of The Previous Proceedings Of Occupation Of The Farms Affected By The Project Of The Solar Plant Called "Vilanova" In The Municipality Of Vilanova D’Encornalbou (Exp.
Announcement Of The Dependency Of The Industry And Energy Area Of The Government Subdelegation In Almería, Which Is Submitted To Public Information The Application For Prior Administrative Authorization For The Modifications Of The Project, As Well As The Application For Administrative Authorization Of Construction For The Photovoltaic Solar Park Tabernas 100 Mw, Of 109.5 Mw Of Installed Power, And Its Evacuation Infrastructures, In The Municipality Of Tabernas, Province Of Tabernas, Province Of Tabernas. Exp.: Pfot 982.
Hiring Of Lighting Works By Means Of Bidegorri Solar Lamps Between Legorreta And Itssoondo.
"Supply, Assembly, Run And Legalization Of A Photovoltaic Installation Of 106.08 Kwp Of Self-Consumption With Surpluses Receiving Compensation In The Sagarbide Cover Herri Eskola" Framed In The Recovery, Transformation And Resilience Plan Financed By The European-Nextgeneu Union
Supply, Installation And Maintenance Of Three Solar Plants
Alienation Of 60% (In Proindiviso) Of The Plot A.2.2. Of The Bareã ± O Sector (As Described In The Specific Type Of Technical Prescriptions)
Installation Of Photovoltaic Solar Panels On The Multipurpose Track Cover (Multipurpose Space) To Produce Energy For Self -Consumption Shared With Compensation Of Surplus 128.8 Kw Pic And 100 Kw Nominal With A 57% Self -Consumption Percentage And Reduction Of 87 Tons Of Co2 Emission
Supply, Installation And Maintenance Of Three Solar Floors
Announcement Of The Territorial Delegation Of Economics, Finance, European Funds And Industry, Energy And Mines In Malaga, Which Is Convened By The Removal Of Minutes Prior To The Occupation Of Farms Affected By The Project Of The Photovoltaic Solar Plant Called "Casares Solar Iii" In The Municipality Of Casares (Málaga), Located In The Municipality Of Casares, In The Province Of Malaga, Corresponding To The Province Of Malaga Cg-952.
Announcement Of The Industry And Energy Dependency Of The Government Subdelegation In Albacete, Which Is Submitted To The Public Information Procedure, The Environmental Impact Study, The Application For Prior Administrative Authorization And The Application For Administrative Authorization Of Construction For The Photovoltaic Solar Park Hybrid Mune Ii, Of 29,264 Mw Of Installed Power, For Its Hybridization With The Winer Wind Park Ii, 30.6 Mw Of 30.6 Mw Installed, And For Part Of Its Evacuation Infrastructure, In The Province Of Albacete. Peol-Fv-184.
Services Contract (Cont 2025 0000407112)
60% Alienation (In Proindiviso) Of The Solar A.2.2. Of The Bareño Sector (According To The Description Of The Technical Prescriptions)
0000370/2025 Writing Service Of The Basic And Execution Project, The Coordination In The Field Of Health And Safety During The Elaboration Of The Project, The Directorate Of Work And Coordination In The Field Of Health And Safety During The Execution Of The Works For The Installation Of Photovoltaic Solar Energy In Different Health Centers Of The Andalusian Health Service In The Province Of Almería. (Financed With Feder Funds From Framework 2021-2027).
Cc: +6.Ccudi-S (0000780/2024) Services For The Directorate Of Works, Directorate Of Execution And Coordination Of Health And Safety During The Realization Of The Construction Works Of The Photovoltaic Solar Installation Of Self-Consumption Without Surpluses In Marques Of Parking Spaces At The Reina Sofía Sofía University Hospital Of Córdoba (Financed 85 % With Feder Funda Del Marco 2021-2027)
Cca:+ 6.Cfscrc+ Hiring Of The Work Of Photovoltaic Solar Installation Of Self -Consumption Without Surpluses In The Carlos Castilla Del Pino Health Center, Financed In 85% With European Funds (Feder) Through An Open Procedure (Pa 57/24)