Toggle Offcanvas
...
 
Global Spain Photovoltaic Module Tenders

Spain Photovoltaic Module Tenders

Bid on readily available Spain Photovoltaic Module Tenders with GlobalTenders, the biggest and best online tendering platform, since 2002. Globaltenders.com offers an unmatched database of Photovoltaic Module tenders from Spain, more than any other platform. Daily, new procurement opportunities for Photovoltaic Module are uploaded from thousands of sources including all Spanish official websites, Spanish municipal websites, Spanish newspapers and journals.

Bidding for Photovoltaic Module tenders in Spain is extremely lucrative for companies of all sizes. Spain tendering authorities release contracts for most of the Photovoltaic Module products and services procured by them. The most popular categories are -

  • Spain photovoltaic module tenders
  • Spain pv module tenders
  • Spain solar photovoltaic tenders
Sign up to get instant access to unlimited Spain Photovoltaic Module Tenders with advanced search filters, market analysis, industry trends, tender training and 24/7 customer support. Spain Photovoltaic Module market analysis, Spain Photovoltaic Module industry trends, Spain Photovoltaic Module tender training and 24/7 customer support.

137 Live Notices for Spain Photovoltaic Module Tenders

Showing 1 to 20

Shadowed And Photovoltaic Plates In The Port Of La Atunara
country Spain
posting date02 May 2025
deadline17 May 2025
"Photovoltaic Facilities In Las Cumbres De Gran Canaria". Financed By The European Union - Nextnerationu Within The Framework Of The “Recovery, Transformation And Resilience.
country Spain
posting date02 May 2025
deadline22 May 2025
This Public Works Contract Aims To Execute The Energy Rehabilitation Works Of The Pratdip Municipal Pavilion According To The Technical Characteristics And Conditions Determined In The Executive Project. In Line With Improving The Thermal Performance Of The Current Building, Reducing The Dependence On Conventional Sources, Reducing Its Carbon Imprint And Contributing To The Transition To A More Sustainable Energy System, The Main Actions In The Municipal Pavilion Are As Follows: -Energy Rehabilitation Of The Envelope With The Incorporation Of Passive Systems Through Ventilated Facade And Renovation Of Roof And Renovation With Sandwich And Renovation With A Roof And Renewal Of The Roofing Panel And Renovation With A Roof Renovation And Renovation With A Roof Renovation And Renovation Of Roof And Renovation Of Roofs And Renovation Of Roofing Panels And Renewal. Acoustic Inside. -Installation Of Photovoltaic Panels On The New Power Cover 40 Kw (48.48 Kwp) By Shared Self -Consumption Connected In The Interior Network, And Located On The South -Facing Skirt. -Proach Of The Interior Spaces, Both Public And Private, With The Relocation Of The Stands At A Higher Level In Order To Place Them Under The Changing Rooms, The Technical Rooms And The Warehouses, Maintaining The Strip Of Rooms Attached To The West Side Of The Building. -Existing Sports Cloth, Located At 0.00M, Maintaining The Current Dimensions Of 22.45X44.35M And An Area Of ​​1,028 M², Giving Fulfillment To The Pav-1 Card Of The Catalan Sports Council With Marking On A Handball Court, A Futsal Court, A Basketball Court, A Volleyball Court And Two Badminton Tracks. The Sports Court Will Be Divisible With Central Curtain To Create Two Tracks. -Given The Proximity Of The Pavilion With The Bar And The Internal Communication Existing Between The Pavilion And The Establishment, It Is Proposed To Keep It. The Total Area Of ​​The Action Is 3,448 M2 And A Total Built Area Of ​​1,797 M2.
country Spain
posting date02 May 2025
deadline22 May 2025
Administrative Contract For Project Writing And Execution Of Works Of Photovoltaic Facilities In The Covers Of Municipal Ownership Buildings.
country Spain
posting date02 May 2025
deadline15 May 2025
Supply And Installation Of Smart Bus Stops With Photovoltaic Panels And Work On Concrete Platforms At Various Bus Stops In Pineda De Mar, Divided Into Lots Lot 1 Project Of The Supply And Installation Of Smart Bus Stops With Photovoltaic Plates Lot 2 Executive Project For The Implementation Of Various Platforms At Various Platforms At Various Platforms.
country Spain
posting date02 May 2025
deadline06 May 2025
Photovoltaic Plant Extension And Electric Vehicle Food System
country Spain
posting date02 May 2025
deadline30 May 2025
Project Writing Services And Execution Works Of Photovoltaic Facilities Of Self -Consumption In Several Prison Centers Within The Framework Of The Recovery, Transformation And Resilience -Fundamentary Plan By The European Union -Next Generation Eu
country Spain
posting date02 May 2025
deadline16 May 2025
The Planned Action Aims To Perform Two Actions: A. Execute Three Photovoltaic Facilities For Collective Self -Consumption With Compensation Of Surplus In The Following Municipal Facilities: I. Josep Gras School And Nursery School. Ii. Ponsferrer Municipal Pavilion. Iii. Red Track. B. Previously, Carrying Out The Construction Of A Roof On The Red Track, Where The Photovoltaic Installation Must Later Be Located.
country Spain
posting date02 May 2025
deadline29 May 2025
Hiring Of The Reinforcement Work Photovoltaic Lighting In Pedestrian Itineraries In Disseminated In Llanos De Monturque (Low Huertas And Las Lagunillas), Monturque (Córdoba), Included In The 2024-2027 Village Plan.
country Spain
posting date02 May 2025
deadline15 May 2025
Supply, Installation, Assembly And Commissioning Of Photovoltaic Solar Panels In The Wwtp Of Sant Antoni De Vilamajor For Autoconsum.
country Spain
posting date30 Apr 2025
deadline15 May 2025
Work "50Kw Photovoltaic Installation On Building Deck For Heated Pools And Hydrothermal Center In Guardo (Palencia)"
country Spain
posting date30 Apr 2025
deadline20 May 2025
Improvement Of Energy Efficiency In The Lodge Of Torre De Juan Abad. Pstd Campo De Montiel Tierra Del Quijote
country Spain
posting date30 Apr 2025
deadline05 May 2025
Supply Of Photovoltaic Plates For The Helena Pimenta Multifunctional Building
country Spain
posting date30 Apr 2025
deadline12 May 2025
Electrical Installation Works In B.T. 80 Kw Photovoltaic Solar Plant For Electric Consumption In Municipal Public Building Of Tarazona - Sports Center ”
country Spain
posting date30 Apr 2025
deadline05 May 2025
Mixed Contract For Improvement Photovoltaic Installation Of Self -Consumption In Municipal Buildings.
country Spain
posting date30 Apr 2025
deadline05 May 2025
Photovoltaic Installation For Self-Consumption On The Ebap Arlegui-Subiza (00000320_001)
country Spain
posting date30 Apr 2025
deadline30 Apr 2025
Project Writing Services And Execution Works Of Photovoltaic Facilities Of Self -Consumption In Several Prison Centers Within The Framework Of The Recovery, Transformation And Resilience -Fundamentary Plan By The European Union -Next Generation Eu
country Spain
posting date30 Apr 2025
deadline16 May 2025
Adapeción Of The 'Space To Prevent' Excess Of Heat And Act As A Climate Refuge For Children In The Event Of A Situation Of High Temperatures. Installation Of A Air Conditioning System, For The Cooling Of The Rooms, But Also As A Redundant System In Heating Of The Building Of The Institut Escola Mossèn Cinto De Folgueroles. These Actions Achieve The Thermal Comfort In Summer, And Also The Possibility Of Partial Substitution Of The Consumption Of Forest Splinters And Gas In The Current Boilers, When The Conditions Of Outside Temperature Are Not Extreme, Due To The Consumption Of Electric Energy Of Renewable Origin With Photovoltaic Self -Consumption Shared In The New Heat Pumps For Air Conditioning. However, The Installation Of Heating With Current Boilers And Radiators Will Be Maintained. The Heat Pump Acts, In Winter Solely As A Back-Up And A Self-Consumption System, If It Is Of The Interest Of The Energy Manager. It Also Includes A New System For The Hygienic Ventilation Of The Air And Renewal Of It With Energy Recovery Of The Air Of Thermal Extraction And Pretreatment And Filtering Of It. An Improvement In Comfort With Summer Cooling Will Be Obtained, Which Is Not Currently Available, And Will Comply With The Efficiency And Renewal Requirements Required In The Current Thermal Facilities Regulation.
country Spain
posting date30 Apr 2025
deadline30 Apr 2025
Photovoltaic Installation For Self-Consumption On The Ebap Arlegui-Subiza (00000320_001)
country Spain
posting date29 Apr 2025
deadline30 Apr 2025
Supply And Works Consisting Of Photovoltaic Facilities For Collective Self -Consumption In The Cover Of 4 Municipal Equipment
country Spain
posting date29 Apr 2025
deadline28 May 2025

Share Share this page