42 Live Notices for Spain Boilers Tenders
Showing 1 to 20
Execution Of The Reform Works Of The Boiler Room Of The Félix De Azara Located Building In The Walqa Technology Park (Cuarte -Huesca-).
Bidding Announcement Of: Autonomous Organism Institute Of Youth. Object: Pellet Biomass Supply For Sanitary Hot Water Boilers And Ceulaj Heating. File: 91/2025.
Fuel For The Pellet Boiler Of The National Reference Center In Building And Civil Works Of The Community Of Madrid In Paracuellos Del Jarama.
Technical-Legal Periodic Preventive Maintenance Service Of Thermal Facilities, Air Conditioning And Ventilation (Gas Boilers, Aerothermies And Air Conditioning) Of The Public Centers Of Torrent.
Boilers Maintenance Service For Air Conditioning And Sanitary Hot Water Of Several Municipal Buildings
Works For The Replacement Of Boilers And The Acs Heating System Existing In Pavilion Costumes For Reunification With The Acs Heating Hydraulic System In The Pool Of The Hytase Sports Center (Cerro Amate District) As Well As Integral Maintenance For A Year, Preventive And Corrective Of The Project Object Of The Project.
Boiler Room Reform At The C.E.I.P. -San Pelayo- From Baños De Río Tobía (La Rioja)
Supply Of Biomass For Boilers Located At La Molina Mountain Station (Ref.Poss39/25)
Boiler Room Reform At The C.E.I.P. -San Pelayo- From Baños De Río Tobía (La Rioja)
Constermery Service In Municipal Buildings Of The Tippity Of A Coruña, By Lots.
Pellet Biomass Supply For Sanitary Hot Water Boilers And Ceulaj Heating
Pellet Biomass Supply For Sanitary Hot Water Boilers And Ceulaj Heating
Dieole Supply C To Feed The Heating Boilers Of The Headquarters Of The National Institute Of Public Administration Of Atocha 106, 28012, Madrid.
Pellet Biomass Supply For Sanitary Hot Water Boilers And Ceulaj Heating
Hiring Works For The Replacement Of The Current Diesel Boiler Of The House Of The City Council Of Mañeru With A Biomass Boiler. Pepac 2023-2027
Contracting Of The Works For The Replacement Of The Boilers And The Endowment Of Hot Water In The Hotel Building In Av. De Sta. Engracia, 1, Of Legutio.
Maintenance Service Of The Ccvoc Biomass Biomass Boilers
Supply And Installation Of Two New Boilers For Heating In The Tuscar Sports Center And The Pla Sports Center (2 Lots)
Hiring Of The Works For The Replacement Of The Boilers And The Provision Of Hot Water In The Hotel Building In Av. De Sta. Engracia, 1, Of Legutio.
Construction Work Of The Boiler Rooms Of Buildings 8G And 8E Of The Vera Campus Of The Polytechnic University Of València