Similar tenders from other countries.
Showing 1 to 20
Complex Estw S 1 North, Building Main Achievements
Current Repairs At The Ifte Installations On The Radius Of The Ifte Bucharest Section-Remote Control Of The Macazuri Heaters In The Cf Cap X And Y Station
Reconstruction Of The Track Section Žďár Nad Sázavou (Outside) - Sázava Near Žďár (Outside)
Design (In The Field Of Srk And Telecommunications Industry) And Execution Of Works For The Task Entitled: Episode 2 - Construction Works On The Railway Line No. 201 Episode Maksymilianowo - Wierzchucin As Part Of The Project "Works On The Maksymilianowo - Kościerzyna Section".
Reconstruction Of The Railway Station Vlkov U Tišnova
Rfi S.P.A Rating Systems.
Žsr, Electrification Of The Haniska Track - Veľká Ida - Moldava Nad Bodvou Town
"Optimization Of The Track Od. Berounka (Incl.
Development Of Project Documentation And Execution Of Construction Works As Part Of The "Ertms Etcs System Development Level 1 Limited Supervision" Project
Santa Ana Level Passage Automation Work
Automation Work Of The Santa Ana Level Passage
Žsr, Electrification Of The Haniska Track - Veľká Ida - Moldava Nad Bodvou Town
Reconstruction Of The Track Section Žďár Nad Sázavou (Outside) - Sázava Near Žďár (Outside)
Execution Of The Works Of The Constructive Projects Of: - Civil Works For The Replacement Of Facilities And Services Located Outside The General Ferrroviary System (Sgf). - Cms For The Displacement Of Railway Security Facilities And Communications. Chamartín Scope.
Reconstruction Of The Track Section Žďár Nad Sázavou (Outside) - Sázava Near Žďár (Outside)
9096 Qualification System For Civil Engineering Works €50K To €1M
"Optimization Of The Track Od. Berounka (Incl.
Implementation Of The Measures Necessary To Operate The Ertms System On The Predeal-Bucharest-Constanța Railway Section And The Expansion Of The Gsm-R System On The Primary Railway Transport-Rail Signal Works For Ertms 2 Level And Railway Traffic Lot 2-Predeal-Buftea And Lot 3 Chitila Baneasa-Pantelimon-Lehliu-Fetești-Constanța
Drafting Of The Constructive Project And Execution Of The Works For The New Automatic Protection Installation Of The Class Step "A2" At The Kilometer 373/734 Of Line 160 Palencia - Santander, In The Municipality Of Alar Del Rey (Palencia).
Reconstruction Of The Track Section Žďár Nad Sázavou (Outside) - Sázava Near Žďár (Outside)