Germany Roofing Materials Tenders
Bid on readily available Germany Roofing Materials Tenders with GlobalTenders, the biggest and best online tendering platform, since 2002. Globaltenders.com offers an unmatched database of Roofing Materials tenders from Germany, more than any other platform. Daily, new procurement opportunities for Roofing Materials are uploaded from thousands of sources including all German official websites, German municipal websites, German newspapers and journals.
Bidding for Roofing Materials tenders in Germany is extremely lucrative for companies of all sizes. Germany tendering authorities release contracts for most of the Roofing Materials products and services procured by them. The most popular categories are -
- Germany roofing tenders
- sheet roofing tenders
- Germany roof work tenders
54 Live Notices for Germany Roofing Materials Tenders
Showing 1 to 20
House Of The Family, Here Roof Waterproofing (Lot 15), Locksmithing Work (Lot 16), And Drywall Construction Work (Lot 17)
Amalienbrücke, Renewal Roof Cover
Suggestion For The Publication Text: Technical Processing: - Measurements, Work And Assembly Planning Timber Construction - Walls And Ceilings: - 131 M² Load-Bearing Wooden Frame External Walls Wh1, Kvh C24, D = 41.25 Cm, Cellulose And Wood Fiber Insulation, U Max. 0.12 W/(M²K), F30-B, 28 Tie Rods - 108 M² Load-Bearing Wooden Stand Interior Walls Wh2, D Approx. 17 Cm, Kvh C24, Mineral Wool 140 Mm, F30-B/Ei 30, 22 Tie Rods - 4 Wooden Supports Made Of Kvh/Bsh, 1 Integrated Steel Support Including Connections And Headbands - Approx. 258 M² Load-Bearing And Stiffening Wooden Beam Ceilings Kvh C24, Cross Sections 8/24 To 14/24 Cm, 22 Mm Flat Press Panels, Some F30-B - 10.4 M Central Beam Bsh Gl24C, 20/40 And 20/44 Cm Roof Structure: - 5 Pent Roof Trusses Bsh Gl28H, Length 12.90 M, Span 12.60 M, Incl. Ridge And Eaves Supports - Approx. 127 M Roof Purlins Bsh Gl24C, Various Cross-Sections - 744 M Roof Rafters Kvh C24, 10/20 Cm - Approx. 104 M Foot Purlins Kvh C24, Various Cross-Sections - 4 Pcs Stiffening Fields For Sports Equipment Suspension; Bracing And Wind Truss Associations Roofing Work: - 424 M² Sandwich Roof Panels Da1, Pir Insulation, D Approx. 195 Mm, Trapezoidal Profile, U = 0.21 W/(M²K) - 346 M² Rear-Ventilated Roof Structure Da2, Trapezoidal Sheet Metal Covering, Mineral Wool 200 Mm, Wlg 035, U = 0.17 W/(M²K) - 195 M² Rear-Ventilated Roof Structure Da3, Trapezoidal Sheet Metal Covering, Insulation Between Rafters 200 Mm, Wlg 025, U Max. 0.12 W/(M²K), Rounded Roof Edge - 67 M Gutters Rg 500 Incl. Connection And Moldings - 67 M Snow Guard Systems; Eaves, Drip And Connection Sheets, Insect Screens And Ridge Vents - 1 Piece Of Roof Protection, Sanitary Wing - Existing Roof: - 160 M² Dismantling And Disposal Of Existing Roof Sandwich Panels - 160 M² New Roof Sandwich Panels, Profile And Appearance According To Inventory / Planning - 160 M² Roof Sealing Membrane Incl. Seam Sealing, 24 M Roof Sealing Connections Rising Facade - Visual Inspection And Airtight Connections In The Existing Building
Family House, Here Roof Sealing (Lot 15), Locksmith Work (Lot 16), And Drywall Work (Lot 17)
Volume Tender For Glazing Work
Volume Tender For Glazing Work Information In Accordance With Section 20 Paragraph 4 Vob/A
Reorganization And Revitalization Of The Aok-Darmstadt Location "Dismantling, Gutting, Pollutant Remediation" Aok Hessen Is Planning To Renovate And Reorganize The Existing Administrative Location At Neckarstraße9, 64283 Darmstadt. The Aim Of The Measure Is To Adapt The Location To Modern And Flexible Work Structures As Well As The Comprehensive Structural And Energy-Related Upgrade Of The Existing Building Ensemble. The Construction Measure Includes The Following Key Points: Structural Adjustments And Reorganization Of The Building Access; Reconstruction And Redesign Of The Customer Center; Dismantling Of The Existing Glass Pyramid On Section N; Creation Of New Entrance And Access Areas; Creation Of A Central Barrier-Free Access Including Elevator System; Structural Reorganization And Upgrading Of The Corner Of Neckarstrasse And Elisabethenstrasse; Construction Of A Central Technical Structure On The Parking Deck; Comprehensive Renovation Or Adaptation Of The Technical Building Equipment; Measures For Ventilation And Smoke Extraction In The Underground Car Park; Redesign And Energy-Efficient Improvement Of The Building Envelope; Energetic Upgrade Of Technical Systems; Redesign And Adaptation Of The Outdoor Facilities. Due To The Limited Space Available On The Construction Site And The Number Of Trades Involved In The Measure, The Available Be Areas Are Broken Down And Allocated By The Client/Construction Supervision. The Assigned Areas Will Be Adjusted As The Construction Progresses And The Performance Level Of The Individual Trades. There Is Only Very Little Storage Space Available On The Construction Site For Long-Term Material Storage. Material Deliveries Must Be Adjusted In Quantity Accordingly And Timely Installation Of The Delivery Material Must Be Ensured. The Provision Of The Service Must Be Coordinated And Coordinated With The Trades Or Specialist Construction Managers Involved In Order To Ensure Proper Execution And In Order To Promote The Construction Process. Due To The Age And The Different Construction Phases Of The Building Ensemble, Deviations And Undocumented Existing Structures Or Pipe Routing Are To Be Expected. Before The Execution Of Breakthroughs, Drilling, Fastenings, Demolition Work Or Interventions In Existing Components Are The Responsibility Of Checking The Existing Constructions, Cable Routing And Technical Systems For The Local Conditions Required For Execution And Taking Necessary Protective Measures If Necessary. Project Framework Data Existing Area: The Existing Building Ensemble Was Essentially Built In 1957 And 1987 And Includes The Following Components: Component E (Bt-E) Southern Block Edge Development (Elisabethenstaße), Administration Area, 3 Floors, Basement: Technical/Archive/Auxiliary Rooms Ec - Og3: Office Area Dg: Photovoltaic System Component N (Bt-N) Eastern Block Edge Development (Neckarstraße) Administration And Meeting Area, 3 Floors, Ec: Access, Meeting Rooms, Breakfast Café, Tea Kitchen, Sanitary Area Og1 - Og3: Offices, Meeting, Break Area, Sanitary Areadg: Technical Areacomponent A (Bt-A) Northern Property Area (Adelungstrasse)Customer Center, Advice And Office Area, 1 Floor, Basement: Exercise Rooms, Sanitary Areas, Technical, Archive And Ancillary Roomseg: Main / Side Entrance For Customers; Customer Center; Consulting And Office Area Parking Deck / Underground Car Park In The Inner Courtyard: Access Via Elisabethenstrasse (South) And Adelungstrasse (North) Project New Building Area: Ensemble Corner Restructuring Of The Building Corner Pallaswiesenstrasse / Neckarstrasse Formation Of The Building Corner Via An Attic Beam Construction Of Balconies As A Lounge Area (And Overbuilding Of The Existing Department Boxes) Ventilation Center Production Of A Central Technical Structure On The Parking Deck With Roofing Over The Entrances To The Customer Entrance Bt-A And Employee Entrance Bt-Neg: Stairwell To The Technical Level; Bicycle Parking Spaces; Og: Ventilation Center Managem
New Grimma Building Yard; Covered Bulk Goods Boxes
Carrying Out All Roof Waterproofing And Plumbing Work, Including Supply, Manufacture And Installation Of The Necessary Roof Structures And Waterproofing Systems; Among Others
Roof Work Including Carpentry Work For The New Building Of The Confidence Meeting Center In Spandau
Roofwork Including Carpentry Work For The New Building Of The Confidence Meeting Centre In Spandau
Labau_He2026_Bund/Land
Metal Construction And Glazing Work As Part Of The Expansion Of The All-Day Offering At The Keltenberg School In Glauburg-Stockheimmetal Construction And Glazing Work As Part Of The Expansion Of The All-Day Offering At The Keltenberg School In Glauburg-Stockheimmetal Construction And Glazing Work As Part Of The Expansion Of The All-Day Offering At The Keltenberg School In Glauburg-Stockheimtype Of Order: Metal And Glazing Work Place Of Execution: Keltenbergschule, Bahnhofstraße 8, 63695 Glauburg-Stockheimtype And Scope Of Service:General Construction Description:The Extension To The Keltenbergschule In Glauburg Is A Solid Construction And Includes The All-Day Area, Including A Cafeteria, Specialist Rooms And Some Classrooms. On The 2Nd Floor There Is A Wooden Frame Staggered Floor In Which The Technology And Storage Rooms Are Located. The Building Is Accessed Via Two Staircases And Accessibility Is Achieved With An Elevator. The Building Has A Ventilated Curtain Wall. The Roof Area Above The First Floor Is Designed As A Green Flat Roof With A Pv System. An Aluminum Standing Seam Roofing Is Used On The Staggered Floor. The Outer Walls And Walls Of The Staircase On The Ground Floor And 1St Floor Are Made Of Reinforced Concrete. The Other Load-Bearing Interior Walls Are Made From Sand-Lime Brick Plan Elements. Solid Reinforced Concrete Ceilings Are Provided. The Non-Load-Bearing Partition Walls Will Be Constructed Using Dry Construction. The Construction Site Access Is Planned Via Bahnhofsstrasse, Herrenstrasse And Maiostrasse Along The Sports Field. The Access Route Must Be Taken Into Account When Calculating The Delivery. When Calculating, It Must Be Taken Into Account That Some Of The School Traffic Is Also Handled Via Maiostraße. A Parking Ban Is Planned Here, But There May Be An Increased Volume Of Traffic During Peak Times (7:00 A.M. To 9:00 A.M. And 1:00 P.M. To 2:00 P.M.). These Times Are To Be Avoided As Delivery For Material. When Carrying Out The Work, Care Must Be Taken To Ensure That The Students Are Not Endangered When It Is Carried Out During School Operations. Saturday Work Without Additional Remuneration Is Required. Building Data: Gfa 2,100 M² Gross Floor Area Bri 8,700 M³ Gross Volume. Trade Description With The Main Dimensions: - 28 Aluminum Windows & Blinds With Guide Rails In Different Sizes - 2 Post-Transom Facades In The Area Of The Stairwells - 10 Aluminum Internal Doors, Some Of Which Are Fire And Smoke Protection Doors - 5 External Doors In Different Sizes - 3 Steel Doors T 30 In The Dgexecution Deadlines: - Work - Assembly Planning And Preparations: Immediately After The Order - Start Of Execution Of The Construction Work: 21St Week Of 2027 - Completion Of The Construction Work: Expected In The 27Th Week Of 2027
SaNieRung RatHaus KemBerg - DachKlempNerArBeiTen
Lot 32 - Conversion Of Existing Buildings - Roof Work
Lot 1 Demolition Of Roof Structure
Lot 2 Roof Sealing, Iso Sheets, Steel Construction
Helios Specialist Clinic Schleswig - Forensics Order No. 21 Demolition Work 1St Ba (Ba Vm)
Renovation Karl-Fischer-Weg 10 – Lot 04: Roof Renovation
Steinekirch / Catholic Church Foundation St. Vitus, Modestus And Kreszentia - Rectory - Roofer
Roofing Work