Similar tenders from other countries.
Showing 1 to 20
Supply Materials For Current Repairs In Its Own
Procurement Of Overhaul Of The Heating, Ventilation System And Electric Generator Of The Gabala Executive Power For 2025 By The Gabala District Executive Power
Fankoil, Ventilation, Chiller System, Generator, Electrical Regulator, Oxygen Station, Fire Protection System And Water Stock Equipment Supply Spare Parts And Technical Services
The Purchase Of Stationery, Household Goods, Manual Electronic And Designed, Electronic Boards, Projector And Furniture. Haridi Molkhoi Conslicles, Kochagidori, Asbobha Dusty Electricians, Takhtai Electronics, Projector Wa Furniture.
Supply New Generator For Mutare Grain
Electric Mto
Maintenance & Repair Pump Computers Tylissou
Electric Materials Supply And Delivery Market
Td/T/4264/Pc3/2024 (10640) - Framework Agreement For The Supply And Delivery Of Low Voltage Fuses
Procurement Of Goods: "Purchase And Installation Of The Electricoman Carment At The Pps Ruzina In 2025. Years"
Supply of corrosion-resistant injection pumps and operating panels for the Zadi Obeid and Bishri fields
Maintenance Of Its Solar Panels And Photovoltaic Facilities
Implementation Of A Photovoltaic Solar System In The Automotive Diagnostic Center Of Valle Ltda., Through The Purchase, Installation And Commissioning Of Solar Panels In The New Building; Of Co
Renovation Of Vacancy Of Residential Premises: Part 1: Nowolipki 12A M 7, Part No. 2: Cicha 1 M 9, Part 3: Koźmińska 18 M 10
Design, Supply, Supply And Cabinet Recipe Hosting Control Equipment Control Equipment Htb Transport Posts
Procurement Of Tools And Equipment
Purchase Of Medical Equipment For The Hospital Emergency Department
Renovation Of Vacancy Of Residential Premises: Part 1: Orla 3 M 5, Part 2: Jesuit 6/8 M 28 - Divided Into 2 Parts
Renovation Of The Vacancy Of Residential Premises: Part 1: E. Plater 8 M 23 (Adk-2), Part 2: Chmielna 10 M 48 (Adk-5), Oleandrów 2/4 M 2 (Adk-2) (Divided Into 3 Parts)
Making Deliveries To Supplement The Storage Reserve In The Scope Of Switches To A Voltage Of 110, 220, 400 Kv (In The Period Of 60 Months)