Similar tenders from other countries.
Showing 1 to 20
3 Promontory Foundation Construction And Surfacing Repair
Construction Of Ramp, Extension Of The Stem (Causeway) Of Tourist Rcc Jetty At The Mouth Of The River Bakhkhali In Moheshkhali Channel With Allied Works Under The Project Cox'S Bazar Khurushkul Climate Refugee Resettlement Project.
Maintenance And Repair And Construction Work On The Beaches Of Gemlik And Mudanya Coasts Of Bursa And Other Responsibility
Provision of JETTY INFRASTRUCTURE CONSTRUCTION WORKS AND OTHER RELATED WORKS IN KAMPUNG MERANG, SETIU, TERENGGANU
Reconstruction Of The Bridge On The Dairy Lake And Small Architecture On Water Reservoirs - As Part Of The Green -Blue Bartoszyce Project
Direct Procurement Wooden Bridge Degerö Börtskär
Refurbishment Of The Wittenberge Station Reception Building - Lot 101- Floor Work
Refurbishment Of The Wittenberge Station Reception Building - Lot 34 - Steel Pipe Frame Doors
General Repair Jetty Kampung Rangas Bandar Seri Begawan
Procurement Of Works On The Construction Of A Northern Breakwater On The Island Of Sv. Catherine
Design and Construction of Damaged Service Duct on the Existing Jetty at Galle Fishery Harbour
North Jetty Repairs Project, Indian River Inlet, De
Repair Aton And Demo Aton At Various Locations In Woods Hole, Uscg District 1, Psn#18632375
Construction Of 02 (Two) (4 X 2) Meters Steel Mooring Buoys For Safe Mooring Of Vessels In Natunbazar-Raghunathpur Channel On The Opposite Side Of Rcc Jetty Built Under The Project At Nagarbari Ghat Under The Control Of Aricha Section Of Conservancy & Pilotage Department Of Biwta.
Construction Of 02 (Two) (4 X 2) Meters Steel Mooring Buoys For Safe Mooring Of Vessels In Natunbazar-Raghunathpur Channel On The Opposite Side Of Rcc Jetty Built Under The Project At Nagarbari Ghat Under The Control Of Aricha Section Of Conservancy & Pilotage Department Of Biwta.
Construction Of 02 (Two) (4 X 2) Meters Steel Mooring Buoys For Safe Mooring Of Vessels In Natunbazar-Raghunathpur Channel On The Opposite Side Of Rcc Jetty Built Under The Project At Nagarbari Ghat Under The Control Of Aricha Section Of Conservancy & Pilotage Department Of Biwta.
Procurement Of Works On The Construction Of A Northern Breakwater On The Island Of Sv. Catherine
Contracts Regarding Renovation Kaj Stage 3 Skeppsholmen
Design And Construction Of Electric Passenger Vessels For The Transperth Ferry Service
24Trav27 - Construction Work On A Roro Quay At The Port Of Ayguade Du Levant