Similar tenders from other countries.
Showing 1 to 20
Ekfb Jv - Mobile Cranes (Additional Resource) - Framework Opportunity
Construction Of Pile & Single Storied Academic Building With 4 Storied Foundation Including Sanitary & Electrification Works At Bir Shrestho Captain Mohiuddin Jahangir College,Babuganj Upazila, Barishal District.
Construction Of Pile & Single Storied Academic Building With 4 Storied Foundation Including Sanitary, Water Supply & Internal Electrification Works At Tungibaria Secondary School,Sadar Upazila, Barishal District.
Kbs-Ridp/Sat/Vr-73.6/24-25
Part-A : Improvement Of Parulia Cow Hat -Kalkhali Road At Ch: 00-1900M (Road Id No. 287254019). Salvage Amount : 1206543.00 Bdt. Part-B : Improvement Of Majh Parulia...
Construction Of Pile & Single Storied Academic Building With 4 Storied Foundation Including Sanitary, Water Supply & Electrification Works At Sheed Captain Jahangir (B.S) Secondary School,Babuganj Upazila, Barishal District.
Precautionary Protective Work Along The Left Bank Of The Teesta River From Km. 1.300 To Km. 1.600 = 300.00 Meter At Matukpur In Up:Kolkonda Upzilla: Gangachara , Dist. Rangpur Under Rangpur Wd Division, Bwdb, Rangpur During The Year 2025-26.
Precautionary Protective Work Along The Right-Bank Of Tessta River Km. 8.865 To Km. 9.115=250.00 M At Tabu-Haibatkha In Uz. Kaunia, Dist. Rangpur Under Rangpur Wd Division, Bwdb, Rangpur In Financial Year 2025-2026.
Precautionary Protective Work Along The Right-Bank Of Tessta River From Km. 5.500 To Km. 5.650=150.00M At Char-Gonai In Uz. Kaunia, Dist. Rangpur Under Rangpur Wd Division, Bwdb, Rangpur In Financial Year 2025-2026.
Precautionary Protective Work Along The Right-Bank Of Tessta River From Km. 4.300 To Km. 4.800=500.00M At Horicoron-Sharma & From Km. 4.800 To Km. 5.100=300.00 M At Char-Gonai (Total=800.00 M) In Uz. Kaunia, Dist. Rangpur Under Rangpur Wd Divi...
Precautionary Protective Work Along The Right-Bank Of Tessta River From Km. 3.600 To Km. 3.900=300.00M At Horicoron-Sharma & From Km. 2.720 To Km. 2.820=100.00M & Km. 3.095 To Km. 3.195=100.00M At Chandir-Ghat (Total=500.00 M) In Uz. Kauni...
Precautionary Protective Work Along The Right-Bank Of Tessta River Km. 2.130 To Km. 2.360=230.00 M At Taluk-Shabaz In Uz. Kaunia, Dist. Rangpur Under Rangpur Wd Division, Bwdb, Rangpur In Financial Year 2025-2026.
Precuationary Protective Work Along The Right Bank Of The Teesta River From Km. 0.700 To Km. 1.120 = 420.00 Meter At Godai To Panjorvanga In Uz: Kaunia, Dist. Rangpur Under Rangpur Wd Division, Bwdb, Rangpur During The Year 2025-26.
Strengthening Of The Right Embankment Of Teesta River From Km.46.300 To Km.46.500= 200 M At Banpara & From Km.45.200 To Km.45.550= 350 M At Soulmari In Upazila: Jaldhaka Dist. Nilphamari Under Rangpur Wd Division,Bwdb,Rangpur .During The Year-2025-2026.
Precautionary Protective Work Along The Left Bank Of The Teesta River From Km. 0.400 To Km. 1.000 = 600.00 Meter At North Chilekhal In Up:Kolkonda Upzilla: Gangachara , Dist. Rangpur Under Rangpur Wd Division, Bwdb, Rangpur During The Year 2025-26.
Precautionary Work Along The Protection Of Soulmari Spur-2 Shank (200 M) At Soulmari Mouja In Upazila: Jaldhaka Dist. Nilphamari Under Rangpur Wd Division,Bwdb,Rangpur During The Year 2025-2026.
E-Tender/Pedp4./Prj/Sad/2024-25/W20.750
Repair & Renovation Work Of Pirojpur Sadar Ueo Under Sadar Upazila, Pirojpur
Construction Of Property Wall For Preservation Of Acquired Land At Wtp Gate-3 Area.
Maintenance Uneven Soft Shoulder By Hbb At 58Th Km (P) (Baghat Bazar) Of Dauladia- Faridpur (Goalchamot)- Magura- Jhenaidah- Jessore- Khulna- Mongla (Digraj) Road (N-7) Under Faridpur Road Division During The Fy 2025-2026.
Maintenance Uneven Soft Shoulder By Hbb At 43Th Km (P) (Maijhkandi Bazar More) Of Dauladia- Faridpur (Goalchamot)- Magura- Jhenaidah- Jessore- Khulna- Mongla (Digraj) Road (N-7) Under Faridpur Road Division During The Fy 2025-2026.
Repair Of Existing Pavement & Sbst Work At Ch: 2+400M To Ch: 2+750M And Ch: 11+750M To Ch: 12+460M Of Talma-Nagarkanda Zilla Highway Road (Z-8404) Under Road Division, Faridpur During The Year 2025-2026.