For Design, Examination, Delivery, Installation (Installation), Commissioning "(Turnkey)" Network Solar On-Grid Photoelectric Station With A Total Capacity Of 50 Kw
"Settlement Observations By Geodetic Methods For Deformations Of The Founded Structures Of The Tuyanoma Hydroelectric Power Engine" Illary Bajarish Byichi (Turkmaniston Davlati Joylashgan)
Installation Of 10 Bt Photovoltaic Stations
Work On The Placement Of Two Solar Lamps On Ladder Eressos And Staircase
Supply Of 38 Solar Public Lighting Devices
Installation Work Of Photovoltaic Panels In Roofing And Modification And Repair Of Coverage
Photovoltaic Shade Construction Work
Faisability Study For The Restoration Of Ecological Continuity On The Hydroelectric Power Plants "Hartman" In Epinal And "Broop Jump" In Jarménil-.
Work Of Implantation Of Photovoltaic Facilities At The Base Of The Ertzaintza In Iurreta And In The Erandio Central (Bizkaia)
Photovoltaic Installation Work Contract Located On The Cover Of The Municipal Sports Center
Self -Consumption Facilities Measured 2 Dus 5000 Balazote City Council. Actions Belonging To Local Clean Energy Projects In Municipalities Demographic Challenge (Dus 5000 Program), Within The Framework Of Regeneration And Demographic Challenge Of The Recovery, Transformation And Resilience Plan.
Cca:+ 6.Cfscrc+ Hiring Of The Work Of Photovoltaic Solar Installation Of Self -Consumption Without Surpluses In The Carlos Castilla Del Pino Health Center, Financed In 85% With European Funds (Feder) Through An Open Procedure (Pa 57/24)
Installation Works Of Photovoltaic Panels On The Roofs Of The Eps Polytechnic Ii Buildings, Ep Polytechnic Iv, Faculty Of Economic And Business Sciences, Faculty Of Law And Montilivi Library Of The University Of Girona. This Action Is Funded By A Grant From The Icaen Within The Framework Of The Program For Actions For The Execution Of Various Incentive Programs Linked To Self -Consumption And Storage, With Renewable Energy Sources, To The Implantation Of Renewable Thermal Systems In The Residential Sector, As A Project Funded By The European Union - Nextgenerational In The Framework Of The Recovery Plan. The Granting Of The Grant Was Published On 24/07/2024 In The Partial Resolution Of Granting Subsidies Within The Framework Of The Acc/3662/2021 Resolution, Of December 1, Which Publishes The Call Of The Year 2021 For The Granting Of Grants Of The Aforementioned Program. "Recovery, Transformation And Resilience Plan - Funded By The European Union - Nextgenerationeu" - Ministry For The Ecological Transition And The Demographic Reto
Foundation Execution For Photovoltaic Installation And Services For The Improvement Of The Irrigation System In The Region Of A Limia (Ourense), Charged To The Recovery, Transformation And Resilience (Prtr) Plan, Financed By The European-Nextgeneration Eu Union.
Work And Installation Including Installation Start -Up Photovoltaic System For The Production Of Electrical Energy For Self -Consumpum Through The Model Of Energy Communities For The Benquentification City Council
Implementation Vegetable Screens At The Photovoltaic Solar Plant "Ciudad Rodrigo" (Ciudad Rodrigo, Salamanca)
Work Of Implantation Of Photovoltaic Facilities At The Base Of The Ertzaintza In Iurreta And In The Erandio Central (Bizkaia)
Basic And Execution Project Writing, Health And Safety Study And Subsequent Execution Of The Works That Are Defined In The Energy Rehabilitation In The Entities Center Building, Within The Comprehensive Clean Energy Project In Tamarite De Litera.
Resolution Of The General Directorate Of Energy Policy And Mines Granted To Green Capital Power, S.L.U., The Declaration, Specifically, Of Public Utility, For The Photovoltaic Installation "Dalia" Of 107.54 Mw Of Installed Power And Its Evacuation Infrastructures, In The Municipal Terms Of El Burgo Ranero, Valdepolo And Santas Martas, Province Of León.
Supporting Measurement Technology For The Development Of Highly Effective Converter Systems For Energy Conversion And Pertogas Storage Development From Renewable Energy Sources - Sciis