Design-Production With A View To Carrying Out The Extension Of The Safe Building Of The Airport At Figari Sud Corsica Airport.
Design And Realization Of A Luggage Treatment System - Final Phase, Figari Sud Corsica Airport.
Gps Enabled Airfield Paint Device For Utv
Id-Camas Nwr-Snow Plow And Installation
Announcement For Proposal For Lease Of The Flight Research Facility (Hangar) At Glenn Research Center (Grc)
Amd0001 Synopsis For Architect-Engineer (A-E) Small Business (Sb) Airfield Design Matoc
Earthworks, Health Structure, Structural Work Electricity, Concrete Work; Steel And Wood Constructions, Roof, Facades; Dimensions ‘Rounded’ Of The Hangar L 40M X L 23M X H 10M; General Business Market. The Duration Of The Work Is 85 Working Days, To Start For May 2026.
Maine Air National Guard Fuel Cell Hangar Construction
Bradshaw Army Airfield Obstruction Survey
Rehabilitation Works Of The Hangar 17 And Its Surroundings.
Provision of Reconstruction of Gate 06 and replacement of Gate 07, including emergency access road at Runway 35, Bintulu Airport, Sarawak
Provision of Airside sweeping services on runways, taxiways, aprons, and service road at KL International Airport, Sepang
Provision of Leasing of 10 units of aircraft baggage tractors for baggage handling system (BHS) at Terminal 1, KL International Airport
Service Level Maintenance Contract and Related Works (Package A) for His Majesty The Sultan's Flight Hangar 1, Hangar 2 & Minor Works at Beribd Development Housing
BUILDING CLEANING SERVICES, LANDSCAPE MAINTENANCE AT THE AIR TRAFFIC CONTROL TOWER COMPLEX, AND CLEANING THE QUARTERS AREA, CAAM PULAU LANGKAWI, KEDAH DARUL AMAN
PROCUREMENT OF SATELLITE-BASED ADS-B SYSTEM AT KUALA LUMPUR AIR TRAFFIC CONTROL CENTRE TO COVER AREAS WITHOUT RADAR COVERAGE
Mobile Lifting Equipment Rental
Allocation Of Planning Services For Cellar Renovation At The Airfield In Faßberg (Voek 282-25)
Joint Monitoring Team (Jmt) To Monitor The Principal Contractor On The Design And Build Of The New Realigned Runway 18/36 At Cape Town International Airport For A Period Of 60 Months
Inspections And Load Testing Of Lifting Equipment At The Port Of East London For A Period Of Thirty-Six (36) Months