14 Live Notices for Central Europe Wind Turbines Tenders
Showing 1 to 14
Sealing Of Foundations (In 3 Parts). Part 1: Stabilization Of Foundations And Sealing Of Cable Cords - Fw Kisielice; Part 2: Foundation Stabilization And Sealing Of Cable Cords - Fw Malbork; Part 3: Modernization Of The Foundations Of Wind Turbines - Fw Wikszek
Delivery With The Assembly And Start Of A Wind Turbine Simulator For The Maritime University Of Technology In Szczecin
Delivery Of A Wind Turbine Simulator For The Koszalin University Of Technology.
Simple Market For: Adaptation Of The Turbine Automaton And The Supply Of A Server, A Supervision Software Common To The Rochefort And Montjoyer Wind Farms
Service For Making A Shovel For Wind Turbine And Forms For Its Production For The Faculty Of Electrical Engineering And Automation
Renovation Of The Burned Wind Turbine T06 On The Resko 1 Wind Farm
Simple Market For: Adaptation Of The Turbine Automaton And The Supply Of A Server, A Supervision Software Common To The Rochefort And Montjoyer Wind Farms
Simple Market For: Adaptation Of The Turbine Automaton And The Supply Of A Server, A Supervision Software Common To The Rochefort And Montjoyer Wind Farms
Renovation Of The Burned Wind Turbine T06 On The Resko 1 Wind Farm
Echo Project: Installation Of An Enclosure System Of Fish And Acoustic Sensors On The Sem-Rev Site And On An Area Outside The Influence Of The Floatgen Wind Turbine.
Echo Project: Installation Of An Enclosure System Of Fish And Acoustic Sensors On The Sem-Rev Site And On An Area Outside The Influence Of The Floatgen Wind Turbine
Echo Project: Installation Of An Enclosure System Of Fish And Acoustic Sensors On The Sem-Rev Site And On An Area Outside The Influence Of The Floatgen Wind Turbine
Construction Of Renewable Energy Installations Operating Within The Island Network, I.E. Off Grid (Solar And Vertical Wind Turbines) With A Total Nominal Output Ac 1.63 Mw, With A 6 Mwh Electricity Warehouse And Energy Management System At The Mpk Base In Świdnica At Ul. Engineering 6, For The Needs Of "Green Energy" For The Vehicle Charging Station.
"Equipment Of Two Bcu Studios In Lębork - Equipment, Machines, Simulators And Specialized Devices Necessary For Teaching In The Field Of Renewable Energy (Wind)