31 Live Notices for Central Europe Mining Equipment Tenders
Showing 1 to 20
Pump
Digi Company Foodset S.R.O.
Preparatory Work And Drilling Of The Gfsb-1 / Gfsb-2 Doublet And Its Integrated Services As Well As The Re-Statement Of The Site
Acquisition Of Fire Fighting Equipment (Blasting Pipes, Intermediate Mixers, Eductors And Fire Snakes) For Use On Board The New Mining Vessels Of The Belgian And Dutch Marines (Mine Counter Measures Platforms - Mcmpf).
Conditions Of Earthworks In The Mineral Raw Materials Mine "Malerzowice"
Rent For Jsw S.A. Kwk "Knurów-Szczygłowice" Road Szczygłowice Of The Polemont Wall Combine
"Reconstruction Of The Supervision System Over The Operation Of The Power Network Of The" Wieliczka "Salt Mine Installed At The Grst/15/3/0.4 Kv Station"
Delivery 103 Pcs. Factory New Rescue Regeneration Devices Drager Bg Proair Or Equivalent For The Needs Of The Kwk Mysłowice-Wesoła Branch, Kwk Row Ruch Jankowice Polska Grupa Górnicza S.A. In The Years 2024-2026
14Tei10205 2. S-Bahn Master Route Munich-Pu 30 Shell Construction Work Tunnel West With Trough And Hp Hauptbahnhofbahnhofplatz
Rent For Jsw S.A. Kwk "Knurów-Szczygłowice" Road Szczygłowice Of The Polemont Wall Combine
Performance: 39 pieces of the station skier
1098025 Renovation Of Entry Into The Mineral Mine In Pawłów
Extension Of Mining Shaft Lifts Of The 8Th Eastern And Western Compartment Together With The Buildings Of The Glazing Devices. 880 M For Pgg S.A. Kwk Row Department Ruch Jankowice
Supply Of Equipment For Networks And Roads (New Equipment, Spare Parts And Related Repairs).
Design And Construction Of Building Structures And Land Development For Investments Entitled "Development Of Mining Areas At The Tank In Kozarzewk By Giving Them New Functions: Recreation, Leisure And Tourist"
"Kazimierz Odna - Reclamation Of Post -Mining Areas In The Sosnowiec Commune".
Supply Of Equipment For Networks And Roads (New Equipment, Spare Parts And Related Repairs)
"Delivery Of Spare Parts To Mechanized Housings For The Southern Circle Of Węglowy S.A."
Delivery - Modernization Of 2 Pcs. Tape Conveyors Pioma 1400 For The Southern Cohaft S.A. - Janina Mining Plant
Digi Company Foodset S.R.O.