Similar tenders from other countries.
Showing 1 to 20
Construction Of A New Sub-Package For The Ryukyu Power Plant Fuel Tank And Fire-Fighting System
Public Bidding Advertisement (One-Stage) No. 5429-1404 Related To The Preparation Of Goods And Construction Of The Frequate Facilities And Power Plant Positioning Land And Its Connection To The Tm2 Center (Pc)
General Sports Authority Grid-Tied Solar Pv Power Plant With A Capacity Of 3 Mw Under Capex Model
Bucheon Thermal Merged Power Plant, Fuel -Winning Construction Construction Construction Construction
Construction of structure of generator and auxiliary normal transformers as well as power tunnels of unit 3 of El Dabaa NPP
Photovoltaic Electric Power Plant Tudor Vladimirescu - Tine Project Execution
Construction Of Renewable Energy Installations At The Wsp S.A. - Pyskowice Well
Opz Partial Renovation: Fire Protection Doors
Construct Blast Fence
Harney Gym Renovations Ft Leavenworth
Construction Works For 5Mw Solar Pv Power Plant At Banket 33Kv Substation Including Design, Supply And Commissioning Of The Solar Power Plant.
Execution Of Works For The Investment Objective: '' Electricity Production From The Renewable Solar Source For Self -Consumption In The Uat Commune Small County Giurgiu ''
Execution Of Works For The Investment: Energy Production Capacities From Renewable Energy Sources, For Their Own Consumption In Ilva Mare Commune, Bistrita-Nasaud County.
Presolicitation Notice - Fort Stewart-Hunter Army Airfield Microgrid
Dlr Location Zittau, Gi Neubau Bürogeb. Experimental Hall Di, Cleaning Work (25-0174_B)
The ‘Consuming Two 1 Mw Photovoltaic Farms’ In Plewis 3’S Locate Location Projects Viii , Ix
[E082500282] Signal South Complex Power Plant Construction Project Disaster Impact Assessment Consultation Service
Trafoplan_Gwp_Loss_Los_354_Hoch/Civil Engineering
Installation Of Renewables And Reduction Of Energy Demand In The Building Of Plaza De San Juan De La Cruz 10, Madrid, Affected By The Ministry For Ecological Transition And Demographic Challenge Within The Framework Of The Recovery, Transformation And Resilience Plan (Prtr)
2025 Hengfeng Power Plant Phase Iii Supporting Heating Pipe Network Construction