21 Live Notices for Caribbean Meters Tenders
Showing 1 to 21
Acquisition Of Furniture South Regional Direction, Aimed At Msmes
Acquisition Of Cleaning Materials, To Be Used In The Institution (Stis), Aimed At Msmes Women.
"Acquisition Of Furniture To Be Used In The Different Area Of This Ministry, Aimed At Msmes:"
Water Meter Acquisition
Acquisition Of Nursery Materials
Acquisition Of Equipment For The Electricity Workshop Of The Santa Fe Technical Training Center, San Pedro De Macorís
“Acquisition Of Measuring Instruments, Observation And Essay For The Works Of The Valverde Mao Province Laboratory, Corresponding To The Aps Sector Modernization Program
Overflexible Wire Acquisition Monoconductor Millimeter 35 Mm2
Supply And Installation Of One (1) 910 Cubic Meters And One (1) 227 Cubic Meters Glass Fused Bolted Steel Tank At Baron Hill, Trelawny And Springfield, St. Thomas (Lots 1 – 2)
Geranium Path Collector Sewers - Supply Of All Materials And Labour For The Construction Of 270 Meters Of 200 Mm (8”) Nominal Diameter Collector Sewers
Construction Of Eight Homes Of 63.00 Square Meters Of Construction Finished In Concrete Blocks And Roof Covered With Aluzinc And Wood (Azua And Barahona Province), Reconditioning And Rehabil
Acquisition Of Water Meters, Protective Boxes And Anti -Braces
Acquisition Of Meters With Mobile Network Technology, First Call.
"Acquisition Of Bases Circuitos And Basis Basis Meter
The Institutional Strategic Plan 25-28 Is Composed Of 6 Strategic Axes, 10 Strategic Objectives And Annual Operational Planning For 2025.
The Strategic Perspective Of The Aqueduct Corporation And Boca Chica Sewerage (Coraabo) By 2025 Is That Of Bring Our Drinking Water Production To 54,073,752 M3 (Fifty -Four Million Seventy -Three Thousand Seven Hundred Fifty -Two Cubic Meters), Equivalent To 4,506,146 M3/Month, Carrying The Wells Of Wells In Service From 19 To 31, In Addition To Operating At Full Capacity The Aqueduct Rural La Malena. For Such Purposes We Must Rehabilitate Some Equipment That Is Out Of Service, Optimize The Lines Of Driving And Correcting The Breakdowns In The Distribution Networks. In This Way, The Coverage Of The Supply Of Drinking Water.
Lead The Clean And Renewable Energy Market
The Institutional Strategic Plan 25-28 Is Composed Of 6 Strategic Axes, 10 Strategic Objectives And Annual Operational Planning For 2025.
The Institutional Strategic Plan 25-28 Is Composed Of 6 Strategic Axes, 10 Strategic Objectives And Annual Operational Planning For 2025.
The Institutional Strategic Plan 25-28 Is Composed Of 6 Strategic Axes, 10 Strategic Objectives And Annual Operational Planning For 2025.