REPAIR HOUSE IN JALAN MUARA, KPG SALAMBIGAR, BRUNEI DARUSSALAM
REPAIR HOUSE IN TANJONG MAYA ROAD, BUKIT SIBUT VILLAGE, TUTONG AREA, BRUNEI DARUSSALAM
REPAIR HOUSES ON STREET 1, RPN LAMBAK KANAN, COUNTRY OF BRUNEI DARUSSALAM
REPAIR A HOUSE IN KAMPONG SUNGAI PANDAN, MUKIM BURUNG PINGAI AYER, BRUNEI DARUSSALAM
To Carry Out Repacking Of Spare Filter Sand At Bukit Barun Wtp, Tutong
Refurbishment And Rewiring Of Control Panel At Jrd 10B, Simpang 637, Jalan Madewa, Kampong Madewa.
SUPPLY, DELIVERY, TESTING AND COMMISSIONING OF 2.7KVA PORTABLE GENERATOR FOR RESERVED UNIT ‘C’ COMPANY, TEMBURONG DISTRICT
SUPPLY AND INSTALL NEW B22 LED COLOUR BULBS/ DECORATING LIGHTS C/W ACCESSORIES AT POLICE RU HEADQUARTERS BUILDING, RBPF, BRUNEI MUARA DISTRICT
SUPPLY AND DELIVERY ICICLE LED LIGHTS FOR DECORATIONS OF OFFICIAL EVENTS FOR ELECTRICAL MAINTENANCE LOGISTIC DEPARTMENT YAR 2025, RBPF, GADONG, BRUNEI MUARA DISTRICT
Supply & Install Repair And Replace Cable, Bulbs & Transformer 200w At High Intensity 21 And Low Intensity 21 At Brunei International Airport
Carryout Repair Works For Chilled Water Pumps At Brunei International Airport
Supply, Delivery, Installation and Configuration of 60cm double side NTP analogue clock at Terminal Building, Brunei International Airport
Supply, Delivery, Installation, Testing And Commissioning Of Underground Cabling Works At Department Of Civil Aviation’
Replacement Works of Three (3) Main Switch Boards Including Wiring of the Royal Stage Building, Padang Bandaran, Jalan Sultan, Kuala Belait
Controlling the ‘Soft Skills’ Course Communicate With Impact
Supply and Delivery of Air Inlet Filters for Frame 6541 Gas Turbines at DES Power Station
Construction of a pastoral borehole (3m3/h equipped with a solar-powered pumping system with a water tower) in Sapo
Supply, Delivery, Installation & Testing Of Batteries For 2 Units Of 60kva Uninterruptible Power Supply (UPS), Department Of Civil Aviation
Improving the Standards of Water Treatment Plants - Construction of Bukit Barun Water Treatment Plant Stage 8 - Package 1, Earthworks for Retender Water Treatment Plant Platform
Supply, Fabricate and Install Motor Control Center (MCC) With Integrated Busbar Coupler For Raw Water Pump No. 3 & 4 At Raw Water Pump Station Layong Water Treatment Plant