Similar tenders from other countries.
Showing 1 to 20
Oz/261/288-Ws (Sk)/2025 Pe-Rc Sdr-11 Pipe Delivery
Schultz Pit #3 Gravel Crushing And Earthworks
Construction of Phosphate Beneficiation Plant at Al-Hasa Mine to upgrade quality of existing stockpiles and Run of Mine at Al Hasa and Al-Abiad mines on BOOT Basis
Sustainable Revitalization And Resocialization Of Locality Medard - Building
Gansu Zhanchang Mining Co., Ltd. Public Tender Announcement On The Construction Of Chelugou Osaka Gold Mine Infrastructure Engineering
"Kazimierz Odna - Reclamation Of Post -Mining Areas In The Sosnowiec Commune".
Execution And Installation Of An Arc Light In The Roof Ridge Of The Building
Technical Control Of The Supplementary Mining Project Performed State Of Construction Of The Third Landfill Line For The Delivery Of Coal Block B3
Sichuan Mining Smart Supervision Platform Construction Project System And Equipment Procurement (Three Times) Public Bidding And Procurement Announcement
Performing The Repair Work Of The Shgn
Burgene And The Edughow Rahahin Skvajin Toboshin Teams Of Glaza Glaza Glaza Glaza Sughd Sughd Glaza Sogdy Drma And The Equipment For The Development Of Groundwater To Ensure The Provision Of The State Microfuarge Of The Sughd Region Of Sughd Region To Provide Drinking Water
Access Of The Brückenfeld Pit Rooms, Storage Transport Route And Workshop Area In The Control Area
Construction of infrastructure related to the input of raw materials to the mining complex, Zarand concentrate and pelletizing factories
Implementation Of An Investment Consisting In The Design And Construction Of A Recreation And Sports Complex In Żory As Part Of The Project Entitled: Business In Żory All The Time-Development Of Degraded Areas Of The Embankment Of The Mining Railway Line For The Developmental Purposes Of The Region
Construction Manager
Construction Conductor Line Plant Los Angeles - Mining Tank
Plumas Nf Concow Disaster Aggregate Base
Replacement Announcement The Planning Team Of The Joint Procurement Of Viinikankatu Underground Driving Connection And P-Hämpi Underground Parking Facility Extension
Playing In The Productive Circuit The Outer Dump Valea Rogoases S = 241.18 Ha - Mining Technical Arrangement And Forest Plantation No. 1 S = 75.47 Ha
53--Key,Machine