1119_Eichhofblock Bs3_Garten Design
A12 Inn Valley Autobahn, Landecker Tunnel, Escape And Escape Routes, Stsg And General Renovation - Geotechnical Measurement
Äa: A4 Ost Autobahn, Erbs, Node Prater To Knot Schwechat (Reversal), Traffic Management Planning
Feuerhöscher Test Center, Fire Protection
A23 Southeast Tangent Prater Bridge - Feasibility Study: Replacement New Building Of The Kai And Power Bridge Of The Prater Bridge
Biomass Heating Plant, General Planning
136757_A02, Border Crossing Thörl- Maglern Planning Civil Engineering And Civil Engineering In The Planning Phases Study And Preliminary Draft
A01-A07-A25 Central Area Oö-Project Control
(Provia-Id 134857) Amv499.03.01; Bf. Redl Zipf, Eb Planning, Opt. As And Af Planning
Border Crossings Kittsee, Suben, Thörl-Magler, Nickelsdorf Project Control In The Project Phases Study, Ve, Draft (Option) And Ep (Option)
Competition “Mitte 15 / Westbahnhof” - Procedural Organization And Process Support
10., Puchsbaumplatz 13
General Renovation And Renovation Of The Object For The Use Of Theaters, Karl-Farkas-Gasse 16, 1030 Vienna
Preparatory Measurement Services For The Construction Project "U5 - 2Nd Construction Level"
A00 Vienna/Lower Austria Renovation Vba 2.0 - Test Engineer Steel Construction
4040 Linz, Altenberger Str. 69, Johannes Kepler University, New Building Technology, Architectural Work
Abu And Gzp Leitha Lower Austria 2025
A04, Border Crossing Nickelsdorf A06, Border Crossing Kittsee A08, Border Crossing Suben, Planning Building And Civil Engineering In The Planning Phases Study And Preliminary Draft
Replacement Of A Chiller (Bluebox) In The Iaea Hydrology Lab In G-162 At The Vienna International Centre, Austria.
601581 - Rk2020 - Lkh -Univ. Clinic Graz - 3101 Gardener Work