628 Live Notices for Asia Water Treatment Tenders
Showing 1 to 20
Surveying, Designing Construction Drawings, Total Estimates And Construction, Installation Of Construction Equipment Supplemented With Clean Water Supply Pipelines From Giao Thuy Water Plant Treatment Station To Binh Hoa Booster Pumping Station, Giao Thuy District
Supervise The Survey And Construction, Installation Of Construction Equipment Supplemented With Clean Water Supply Pipeline From Giao Thuy Water Treatment Station To Binh Hoa Booster Pumping Station, Giao Thuy District
Surveying, Designing Construction Drawings, Total Cost Estimates And Construction Additional Construction Pipelines From Yen Loc Water Plant Treatment Station For Water Supply For Hong Quang, Yen Khang And Y Yen Districts
Supervise The Survey And Construction Of Additional Water Supply Pipelines From Yen Loc Hoa Water Plant Treatment Station For Water Supply For Hong Quang, Yen Khang And Y Yen Districts
Supply of M&E Equipment for Sevanagala Water Treatment Plant
Supply of Variable Speed Driver and Accessories for Madarangoda Booster Pump at Kandy South Water Treatment Plant
Supply of Moulded Case Circuit Breakers and Accessories for Kalatuwawa Water Treatment Plant
Supply of Spare Parts for Chlorine System at Kalatuwawa Water Treatment Plant
Provision for Rehabilitation of Dimbulagala Water Treatment Plant
Construction of Boundary Wall and Guard Room at Sirimapura Water Treatment Plant
Provision for Renovation of Quarters (Number 02 & 03) at Kethhena Water Treatment Plant
Provision for Renovation of Buildings at Water Treatment Plant, Ambatale
Proposed clearing and desilting of outlet drain at Kampung Silas and SK Silas, Bintulu
Procurement of Materials and Services for Additional Fire Water Supply to the NII Tanasa Kendari Steam Power Plant
Public Tendering Announcement For The Public Tendering Project Of The #1 And #2 Units And Water Treatment Chemical Instruments For The Hequ Power Plant In Guoyuan Power Plant
A Total Of 19 Undergrounded Samples And Measures Of The Structural Sources Of The Enterprise (Sewage Water) Of The Enterprise In 2025 "
Announcement On The Competitive Negotiation Of Water Quality And Other Testing Services (Three Times) In Chaohu Sewage Treatment Management Office From 2025 To 2026 [2025]
Overhaul Of Boiler No. 5, Steam Turbine No. 5, Secondary Cooling Water Turbine 5, Circulating Water Block 5, Circulating Water In The General Part, Chlorine Treatment System, Medium Drying Air-Style A/B Air Drying A/B Furnace 6 (Measurement-Control Section)-Big Repair Plan In 2025 Pha Lan Thermal Power Joint Stock Company
Joosh Ayil Өkmөtүndө Boulge Jeshtkan Kurulush Ostherinin Kөzөmөldөөry
MAINTENANCE SERVICES FOR TRAINING HALL DORMITORY TOILET, 'GREASETRAP', MANHOLE' AND SEWAGE WATER TREATMENT SYSTEM