51 Live Notices for Asia Traffic Management Tenders
Showing 1 to 20
The Procurement Site Is The Agency'S Main And Backup Data Processing Centers (Firewall, Ipsec Vpn, Ips, Aplication Control, Iplication Control, Identify Awareness, Advanced Networking And Cluster, Antibot, Central Management And Central Management System ("Network Screen) Purchase.
Repairing Km198+200 Bridge, Sai Km219+950 Bridge, Pen Son Km221+577, Go Dong Km225+180; Repairing Sewer At Km188+338, Km192+305, Km192+495, Km192+850; Km193+050, Km195+920, Km207+857, Km210+865, Km211+100, Km211+465, Km211+896, Km212+104, Km217+185, Km217+235, Km218+152; Repairing Electric Lighting System Segment Km206+376 - Km206+1160 (Scope Of Bridge), Km209+400 - Km215+200, Km220+100 - Km220+202; Renovate The Traffic Safety Intersection At Km222+00; Repairing The System Of Signs And Strengthening The Traffic Safety System Through Km187+00 - Km231+667, Highway 10, Thanh Hoa Province
Khlcnt Bidding Package Consulting Designing And Setting Up The Bcktkt Efficience Paint Painting Road Roads, Repairing The System To Ensure Traffic Safety In Some Roads In The City
Repairing Road Surface And Traffic Safety Systems Km1701+100 - Km1702+100, Km1702+600 - Km1704, Km1707+100 - Km1709, Km1711 - Km1713; Repair Of Drainage System Along The Segments Of Km1701+880 - Km1703+100 (T), Km1707+300 - Km1708+400 (P), Km1707+600 - Km1708+400 (T), Km1712+320 - Km1712+750 (P), Km1712+800 - Km1713+530 (T); Repairing Ba Tien Bridge Km1703+591 (P), Highway 1, Binh Thuan Province
The Contractor Selection Plan For The Package Of The Project Of Building A Traffic Light System At Le Ninh - Soviet Nghe Tinh Intersection
Relocating The Traffic Signal System, Trees, Lighting, Security Cameras For The Project Site Clearance Project To Expand Le Loi Boulevard From Phu Son Crossroads To Dong Bridge, Thanh Hoa City
Repair Damage To White Bridge Km70+994, Bung Km88+078; Repairing Damage To The Road Surface Of Km92+700 - Km93+300+300, Km113+800 - Km115+00, Repairing The Drainage Ditch Of The Segment Of Km86+00 - Km102, Supplementing The Reflective Nails Of The Fog Of Km112+00 -Km122+00; Km135+00-Km153+00; Slippery Processing Km128+400-Km131+200 And Supplement The Traffic Safety System/Ql.6, Hoa Binh Province
Approving The Contractor And Project Selection Plan: Building A Lighting And Supplementing System Of Traffic Signs On The Parallel Route East Of Highway 20
Approving The Contractor Selection Plan Before Approving The Project Of Repairing The Road Surface And The Provincial Sugar Drainage System 913B (Km00+700– Km01+520; Km02+000 - Km04+800), Cang Long District
Additional Drainage System Dt.761 From Km28+850 To Km30+800
Additional Drainage System Dt.763 From Km21+200 To Km24+100
Repairing The Background, Road Surface And Completing The Traffic Safety System Km1634 - Km1636; Repair Of Drainage System Along The Segments Km1635+300 - Km1636+150 (T), Km1635+300 - Km1636+700 (P), Highway 1, Binh Thuan Province
Approving The Contractor Selection Plan For Bidding Packages In The Preparation Of Project Investment: Repairing And Replacing The Electric Lighting System Of An Chau Town, Son Dong District, Bac Giang Province
Repairing Roads To The Bridges: Range Of Km3+044; Ditch Km39+300; Mieu Km41+281 Bridge; Bridge 2/9 Km42+631; The Km43+405; Repair Background, Road Surface, Complete Traffic Safety System Km33 - Km36, Highway 61, Hau Giang Province
Repair Of Dt.777 Sections From Km17+000 To Km18+000, Supplement The Road Sewer At Km17+500 And Repair The Drainage System From Km17+000 To Km18+000
Supplementing The Water Drainage System Dt.772 From Km1+000 (Flying Bridge) To Km4+794 (Gia Lao Bridge)
Additional Drainage System Dt.770 From Km7+400 To Km8+550
Additional Water Drainage System Dt.766 Sections From Km8+700 To Km11+000 (Except For Km8+800 To Km9+300 On The Right Of The Route)
Repair Of Road Surface Km12+182 - Km13+700; Repairing Grooves Along The Segment Of Km12+280 - Km12+470 (P); Repair And Strengthen Traffic Safety System Km12+185 - Km18 Tunnel Route Hai Van - Tuy Loan, Tp. Da Nang
Repairing And Strengthening Traffic Safety At The Intersection Position: Km1608+300, Km1687+139, Km1728+200; Km1758+030, Ho Chi Minh Road; Km4+100, Km6+620, Km14+650 Bypass Of Buon Ho Town; Repair Damage To Solar Light System, Km1667+570-Km1793+00 Ho Chi Minh Roads In Gia Lai Province And Dak Lak Province