Similar tenders from other countries.
Showing 1 to 20
Z2Da--Project 756-22-206 Repair Building Envelope
Definitive Execution Project Contract For Approval, Supply, Assembly, Running And Legalization (Hand Key Solution) And Maintenance Service Of A Photovoltaic Installation With Storage In Pavilion 2 Of The Bec
Technical Assistance For The Drafting Of The Study Of Alternatives, And Photovoltaic Installation Project In Covered Covers Of The Tablada Dock For Collective Self -Consumption Of Supplies Of The Port Authority Of Seville
Construction Of Photovoltaic Solar Marquesine
100Kw Photovoltaic Installation And Installation Works On Ceip Prince Felipe Track Cover In San Sebastián De Los Reyes.
The Execution Of A Solar Thermal Installation By Hybrid Solar Captors That Allows The Use Of Heat Exchangers For Water Heating That Reduces Bone Consumption In Biomass Boiler, As Well As Photovoltaic Energy Generation To Reduce The Electric Consumption Of The Hon -Covered Pool. Puente Genil City Council.
Wilena Project - Installation Photovoltaic System + Electr. Connections To Rescue Tower On The Kiebitz
Announcement On The Correction Of Photovoltaic Off-Grid Power Supply Procurement Project In Chuguo Temple And Guoku Temple In Pulan County
80.272.202.2025 Execution Of The Support Structure, Its Delivery And Assembly And Installing A Photovoltaic Installation On It (Solar Panels Owned By The Employer) For The Needs Of The National Center For Solaris Synchrotron Radiation (Ul. Czerwone Maki 98, 30-392 Kraków). This Contract Is Co -Financed From Mein Funds On The Basis Of Contract No. 1/Sol/2021/2 Of December 17, 2021, Concluded With The State Treasury - The Minister Of Education And Science.
The Installation And Commissioning Of Four Photovoltaic Solar Power Plants Located On The Roofs Of The Buildings
Municipal Pve Of Chroustovice Městys
Engineering Service For The Writing Of The Degree Draft Águilas-Guadalentín (Murcia), Photovoltaic Solar Plant.
The Present Contract Of Public Works Is Intended To Execute The `` Project For The Supply And Installation Of Photovoltaic Solar System In Collective Instant Self -Consumption Without Compensation Of 100Kwn Surplus Executed At La Vitxeta School '', Initially Approved By Decree Of The Delegate Councilor Of The Environment, Sustainability And Public Road, Dated October 23, 2024, Of 2024. Additionally The Installation Will Be Executed In Accordance With The Technical Document That Contains The Specificities (Or Concretions) Of The Installation. The Installation Will Be Connected In A Mode Of Self -Consumption With Surplus Welcoming To Compensation Or Supply With Collective Self -Consumption With Surplus Welcomed To Compensation, According To Royal Decree 244/2019, Of April 5, Which Regulates The Administrative, Technical And Economic Conditions Of The Self -Consumption Of Electricity. The Facilities Will Be Executed In Accordance With Royal Decree Law 15/2018, Of October 5, Of Urgent Measures For The Energy Transition And The Protection Of Consumers And Royal Decree 244/2019, As Well As The Regulations That Are Derived From Them.
The Completion Of The Works For The Photovoltaic Solar Installation Of Self -Consumption In Different Municipal Buildings
Expansion Of The Telemechanics System Of Solar Installation
Design, financing, construction, operation and maintenance of a 100 MWp photovoltaic solar power plant with 33 MWh battery storage in Niakaramandougou
Design, financing, construction, operation and maintenance of a 100 MWp photovoltaic solar power plant with 33 MWh battery storage in Dabakala
Construction Of A Gym
Design and construction for the implementation of photovoltaic panels on the Mendixka pole
Photovoltaic installation on roofs, Building D, Richter site