Completion works of the project in the Wilaya of TINDOUF
Study and monitoring of the development work of the BP (construction of a boundary wall at the level of the BP Tissemsilt February 24) DUPW Tissemsilt
Study and monitoring of rehabilitation of BP TOLGA EMIR ABDELKADER R4+LOGT for the benefit of DUPW BISKRA
Study and Monitoring of the Rehabilitation of the Post Office << BRANIS R4 >>> + ON-CALL HOUSING For the Benefit of the Postal Unit Management of the Wilaya of Biskra.
Study, tracking and realization of primary and secondary VRD works of public housing across the wilaya of Tiaret
Announcement Of Consulting No. 08/2025
The study of adaptation and construction of a unit at the level of Zbarbar wilaya of Bouira.
The study of adaptation and construction of a unit in Taghzout wilaya of Bouira.
Announcement Of Consulting
STUDY AND MONITORING & CONTROL OF THE RENOVATION WORKS OF PART OF THE FORMER POSTAL ESTABLISHMENT (ALGIERS NOVEMBER 1)
Announcement Of Consulting No. 02/2025
Carrying Out A Strategic Analysis Study.
Study of a master plan Including the study of execution of its components in Mahdla/Setif.
Study of a master plan including components for the benefit of two annexes in Oran and Constantine.
Study of a master plan of the units /Beni Haoua/Chlef, Mostaghanem, Bejaia + Elouana/jijel + collo/skikda
Study of a master plan including components and VRD in Tigzirt/Tizi Ouzou.
Monitoring and control of ground adaptation works and the construction of a unit in the wilaya of Tlemcen.
Establishment of an adaptation study for Zemmouri.