17 Live Notices for Africa Transmission Lines Tenders
Showing 1 to 17
Spn - Mozambique - Supply Of It Equipment - Songo – Matambo 400Kv Overhead Transmission Line Project
Supply And Delivery Of Optical Fibre Ground Wire (Opgw) - Auas-Kokerboom Ii Transmission Line
The Pre-Qualification Of Various Suppliers For The Design, Manufacture, And Supply Of Various Steel Monopoles Structures To Be Used On Eskom Sub-Transmission Overhead Line Projects, Within Distribution Division, Limlanga Cluster On An “As And When Required Basis” Over A Period Of 05 Years (60 Months
Letter To Extend Validity_Mwp1662Tx-R:Provision For The Framework Agreement For Recovery Of Transmission Lines And Stabilisation Of Towers Including Adhoc Urgent Activities For Transmission Lines
Request For Quotations For An Aerial Survey Of The Auas-Kokerboom Ii 400Kv Line Route
Provision of Feasibility Studies and Development Activities for the 220kV Bulgeall Loosa Transmission Line and 33/132kV Clustering Solution in Eastern Uganda
Itb- Phase 1: Installation Line And Distribution Systems.
CONSTRUCTION OF 33kV, 20km OVERHEAD POWER TRANSMISSION LINE FROM SUBSTATION TO STAR AND COMET
Development Of The Dao, Assistance To The Client And The Follow-Up Of The Work Of The Lot1-C Of The Line 225 Kv Nouakchott-Néma
DESIGN, SUPPLY, INSTALLATION & COMMISSIONING OF THE 400/220 KV KIMUKA SUBSTATION AND ASSOCIATED TRANSMISSION LINES
Supply and Delivery of Earth Wire – Auas-Kokerboom II Transmission Line
Supply and Delivery of Optical Fibre Ground Wire (OPGW) - Auas-Kokerboom II Transmission Line
Supply And Delivery Of Earth Wire – Auas-Kokerboom Ii Transmission Line
Supply And Delivery Of Optical Fibre Ground Wire (Opgw) - Auas-Kokerboom Ii Transmission Line
Establishing An Enabling Agreement For The Breakdown, Maintenance & Repair Functions On Sub Transmission Lines (44-132Kv) Under Dead Work Condition For A Period Of 36 Months On An “As And When” Required Basis In The Free State Operating Unit.
Kzn116- Establishing An Enabling Agreement For The Breakdown, Maintenance & Repair Functions On Sub Transmission Lines (44-132Kv) Under Dead Work Condition For A Period Of 36 Months On An “As And When” Required Basis In The Free State Operating Unit.
Replacement of Wooden Cross Arms with Steel Cross Arms on Various NamPower 66kV Transmission Lines (3 Years)