Berliner Brücke (Teichstr.) - Track Renewal, Bridge Renovation And Integration Of Bicycle Traffic Facilities"The City Council Of Kassel, Represented By The Road Traffic And Civil Engineering Office, And Kasseler Verkehrsgesellschaft Ag Intend To Award Services For Civil Engineering, Track, Road Construction Work And Bridge Renovation As Part Of An Open Procedure. In Addition To The Work Mentioned Above, Marking Work To Re-Divide The Road Cross-Section Is Also Being Carried Out In The Area Of The Teichstraße Stop And The Gilsastraße Stop. For The Sidewalk Areas Barrier-Free Crossings Will Be Created. A Barrier-Free Crossing Point With Traffic Lights Will Be Created In The Intersection Area Of Loßbergstrasse/Teichstrasse. A New Traffic Light Will Be Installed In The Intersection Area Of Gilsastrasse/Dag-Hammarskjöld-Strasse. The Services To Be Awarded Include: · Road Construction For Bicycle Traffic · Repair Of The Bridge Structure, Dismantling And New Construction Of The Contact Protection And Railings · Track Construction. Details Are In Particular The Underlying List Of Services Berlin Bridge (Teichstr.) - Track Renewal, Bridge Renovation And Integration Of Bicycle Traffic Systemstrack Renewal, Bridge Renovation And Integration Of Bicycle Traffic Systemstrade 1: General Workconstruction Site Equipmentconstruction-Related Measures, Auxiliary Servicestechnical Processingtraffic Safetyexplosion Detectiontrade 2: Bridge Constructioncollect And Dispose Of 560 M² Of Asphalt Collect And Dispose Of 760 M² Of Sealing760 M² Of Concrete Surface Prepare 24 M³ Uhfb Protective Layer Install 545 M² Uhfb Chipping Matrix Wear Layer 8 M³ Reinforced Concrete 31 M Steel Railing 72 M Vertical Contact Protection 205 M² Sealing Made Of Liquid Plastic 45 M Elastic Transition Construction Trade 3: Track Construction Work 650 M² Pick Up And Dispose Of Track Construction Paving With Paving Compound 240 M² Paving Strips 1 To Pick Up In 4 Rows 215 M² Expansion Of Asphalt In The Track Areas 175 M² Expansion Of Reinforced Concrete In The Track Areas 890 M² Of Grooved Track Expand And Dispose Of A Leveling Layer Up To 15 Cm Collect And Dispose Of 650 M³ Of Road Demolition Material Deliver And Install 260 M³ Of Subsoil Improvement Made Of 0/56 Ballast Base Layer 225 M³ Frost Protection Layer 0/45 Mm, 20 To 30 Cm Thick Deliver And Install 220 T Drainage Base Layer Pa 22 T Wda, D = 10 Cm, Produce 175 T Drainage Base Layer Pa 16 Td Wda Up To 8 Cm Produce 75 M³ Concrete Base Layer C35/45 With Ppp Fiber Content 450 M² Asphalt Binder Ac 16 Deliver And Install 75 M³ Bituminous Base Layer 0/32 Produce In The Area Of Tracks 950 M² Deliver And Install Asphalt Surface Layer 0/8Mm, 3.5 Cm Thick. 50 M³ Installation Of Concrete Roadway C35/45. Remove And Dispose Of 300 M Of 59R2 Grooved Track. Produce And Pour In 300 M Of 59R2 Grooved Track And Dispose Of 150 M² Of Paving, Pick Up And Temporarily Store 215 M Of Curbs, Pick Up And Dispose Of 40 M Of 1- To 3-Row Gutters, Pick Up And Dispose Of, 25 M Of Two-Row Paving Strips Made Of Natural Stones, Pick Up And Dispose Of, 25 M Paving Strips Of Two-Rows Made Of Natural Stones, Pick Up And Store 85 M Of Gutters, Pick Up And Dispose Of, 60 M³ Of Soil, Loosen And Dispose Of, 80 M² Of Gravel Loosen, Convey, Store Temporarily, Install 14 T Frost Protection Layer 0/32365 M² Produce Frost Protection Layer 0/45 365 M² Deliver And Install Bituminous Base Layer Ac 32 Ts Spray On 365 M² Bituminous Binder Deliver And Install 365 M² Asphalt Concrete Ac 11 Ds Deliver And Install 150 Guide Thresholds Made Of Recycled Rubber Deliver And Install 100 M Concrete Paving Strips 25 M² Lay Guidance System 155 M Deliver And Set Concrete Curbs 60 Pieces Of Crossing Board Deliver And Lay 1 Piece Of Lsa 5 M Cable Work Documents To Be Submitted Documents To Be Submitted With The Offer: 121 As_O_Kvg-26-031103 Nu_O_Kvg-26-031106 Ebg_O_Kvg-26-031107 Ee_O_Kvg-26-031104.1 Etb_O_Kvg-26-031104.2 Ewl_O_Kvg-26-031Eigenerklaerung_Rus_Sanktionen_Art_5K_O_Kvg-26-03