Summary: | Delivery Of A Pilot System Consisting Of A Photovoltaic System And A Stationary Storage Battery |
|
|
|
Notice Type: | Tender Notice | Deadline: | 25 Mar 2021 |
|
|
|
Summary: | Wacker Chemie Sustainable Solutions |
|
Sector: | Industry,Chemicals,Renewable Energy,Water and Sanitation |
|
Country : | Germany | Estimated Cost: | EUR 605000000 |
|
Notice Type: | Project Information | Deadline: | 31 Dec 2023 |
|
|
|
Summary: | Saar Lb Climate Action Mbil Ii |
|
Sector: | Renewable Energy,Banking, Finance, Insurance and Securities (BFIS),Consultancy |
|
|
Notice Type: | Project Information | Deadline: | 31 Dec 2024 |
|
|
|
Summary: | Electrical Installation / Pv Systems - New Hemcp-electra Building, Building 10.22 |
|
Sector: | Renewable Energy,Infrastructure and construction,Energy, Power and Electrical |
|
|
Notice Type: | Tender Notice | Deadline: | 12 Apr 2021 |
|
|
|
Summary: | Maintenance And Repair Work At The Senvion Nwalde-altenkrempe Wind Farm |
|
Sector: | Renewable Energy,Infrastructure and construction |
|
|
Notice Type: | Tender Notice | Deadline: | 22 Mar 2021 |
|
|
|
Summary: | Two Large Gas-fired Independent Power Producer (ipp) Projects, Which Will Be Located In Taiba And Al-qassim. The Projects Are Both Scheduled To Have A Capacity Of 3.5gw. |
|
Sector: | Renewable Energy,Consultancy |
|
|
Notice Type: | Contract Awards | Deadline: | 28 Feb 2022 |
|
|
|
Summary: | Solar + Battery + Diesel Offgrid Energy System. |
|
Sector: | Machinery and Equipments(M&E),Energy, Power and Electrical,Renewable Energy,Consultancy - Engineering,Infrastructure and construction |
|
|
Notice Type: | Contract Awards | Deadline: | 28 Feb 2030 |
|
|
|
Summary: | Electrical Engineering And Communications Engineering |
|
Sector: | Renewable Energy,Fire Safety and Security,Infrastructure and construction,Energy, Power and Electrical,Telecommunications |
|
|
Notice Type: | Tender Notice | Deadline: | 04 Mar 2021 |
|
|
|
Summary: | One Solar Plant For Turkey (total 50 Kwe) |
|
|
|
Notice Type: | Tender Notice | Deadline: | 19 Mar 2021 |
|
|
|
Summary: | Design Contract For The 900mw He Dreiht Offshore Wind Farm To Hamburg-based Engineering Firm Jörss-blunck-ordemann. |
|
Sector: | Energy, Power and Electrical,Renewable Energy |
|
|
Notice Type: | Contract Awards | Deadline: | 28 Feb 2025 |
|
|
|