Summary: | The project addresses two problems simultaneously.
1) The need to remove organic material from trade effluent
2 )The requirement for high quality ash-free protein/lipid, within the aquaculture indus |
|
Sector: | Laboratory Equipment and Services |
|
|
Notice Type: | Project Information | Deadline: | 30 Jun 2062 |
|
|
|
Summary: | OBJECTIVES AND EXPECTED ACHIEVEMENTS In the large. socio-economically important, Mediterranean marine fishery for the Swordfish (Xiphias gladius) the determination of sex and gonadal maturity of fishe |
|
Sector: | Laboratory Equipment and Services |
|
|
Notice Type: | Project Information | Deadline: | 29 Feb 2080 |
|
|
|
Summary: | Support for short term scientific missions (STSM) on "melanoidins in food and health" in the frame of cost action 919-exercice 2000. |
|
Sector: | Laboratory Equipment and Services |
|
|
Notice Type: | Project Information | Deadline: | 26 May 2033 |
|
|
|
Summary: | Soil structure interaction in urban civil engineering" in the frame of COST action C7
|
|
Sector: | Environment and Pollution |
|
|
Notice Type: | Project Information | Deadline: | 14 May 2060 |
|
|
|
Summary: | This proposal shall enable medical professionals to develop new concepts for curricula and medical education under the aspect of gender dimensions in medicine. The study will support the development i |
|
|
|
Notice Type: | Project Information | Deadline: | 30 Sep 2071 |
|
|
|
Summary: | Supply chain management and logistics determine the competitive position of companies. At present, both are in a rapid transformation process, which will fundamentally alter supply chain ownership, as |
|
Sector: | Consultancy,Transportation |
|
|
Notice Type: | Project Information | Deadline: | 21 Dec 2059 |
|
|
|
Summary: | The project SAIL intends to improve the intermodal transportation of semi trailers in Europe. There is a need for this project because the European road transport is dominated by semi trailers on aver |
|
Sector: | Roadways,Laboratory Equipment and Services |
|
|
Notice Type: | Project Information | Deadline: | 25 Jun 2060 |
|
|
|
Summary: | The objectives of the proposed project are:
1) To set up and run a strategic dialogue in the form of a foresight exercise that prepares guidelines to analyse the influence of non-transport policies |
|
Sector: | Laboratory Equipment and Services |
|
|
Notice Type: | Project Information | Deadline: | 28 Apr 2069 |
|
|
|
Summary: | The specific measurable objectives of ALP-NET are: first, to provide an inventory of and assess relevant research on the horizontal theme of technical input, namely data, methods, models and GIS.
|
|
Sector: | Laboratory Equipment and Services |
|
|
Notice Type: | Project Information | Deadline: | 10 Dec 2076 |
|
|
|
Summary: | Aviation policy information resources based on observatory networks. |
|
Sector: | Laboratory Equipment and Services |
|
|
Notice Type: | Project Information | Deadline: | 08 Nov 2074 |
|
|
|